30.01.2015 Views

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Dr. Tom Sheng conducted an STTA assignment to review the status of Task 2.3 (21 July to 5<br />

August).<br />

Dr. Mark Svendsen conducted an STTA assignment to review the status of the M&E data collection<br />

and to prepare a plan for monitoring two new indicators related to organizational performance of the<br />

integrated districts and the BCWUAs (13 to 29 July).<br />

A monthly project coordination meeting was held on July 5 with Eng. Wafaa (USAID COTR), Dr.<br />

Mohamed Motaleb (Project Coordinator), and Andrew Tczap (IRG COP) and Eng. Mohamed El<br />

Fetyani in attendance. Main topics discussed included: potential FARA for canal maintenance, status<br />

of Ministry of Agriculture and Land Reclamation (MALR) staff on LWOP, possible use of the<br />

MWRI training center, upcoming study tours, and the July training schedule.<br />

USAID and IRG met on July 5 to discuss the results of the coordination meeting. Eng. Wafaa<br />

(USAID), Eng. Tczap (IRG), Eng. Nabil Fawzi (IRG), and Dr. Wadie (IRG) attended this meeting.<br />

MWRI and IRG met on July 28 to be briefed on Dr. Svendsen’s activities during his mission,<br />

including his conclusions and future plans. They also discussed Dr. Sheng’s preliminary conclusions<br />

based on review of the project’s Information Management System (IMS) activities and his visits to<br />

Mansoura Regional Office (RO) and to the West Belbeis and Eltollombat IWMDs (as well as to Abo<br />

Kebeer, an IWMD supported in IWRM I). Dr. Sheng’s planned activities during the remainder of his<br />

assignment were discussed as well. Dr. Motaleb, Eng. Tczap, Eng. El Fetyani, Eng. Nabil, Dr. Wadie,<br />

and Dr. Moamen attended the meeting, together with Drs. Svendsen and Sheng.<br />

Staff coordination meetings were held on July31, and August 9 and 18. The RO staff attended the<br />

July 31 and August 18 meetings.<br />

MWRI and IRG staff met on August 4 to discuss the status of the IWMD digital maps (11 layers)<br />

and the possibility of developing a course to demonstrate how GIS technology can integrate<br />

information from different sources and perform geospatial analysis to support water management<br />

decision making at the district and directorate levels. Engs. Tczap, Nabil, Hesham (Irrigation<br />

Department), Tarek (Planning Sector), and Dr. Sheng attended the meeting.<br />

Mr. Tczap and Eng. Nabil made an inspection visit to Shoubra IWMD on August 15.<br />

MWRI and IRG staff met on August 21 to discuss project status. Dr. Khaled Toubar (MWRI<br />

Coordinator), Mr. Tczap, and Eng. Nabil attended this meeting.<br />

The IWRM <strong>II</strong> COP, Mr. Tczap, departed on leave on August 22 and returned to the office on<br />

September 4.<br />

An IRG staff coordination meeting was held on September 4 to begin preparing for the Year 4<br />

Work Plan workshop.<br />

A meeting was held on September 6 to brief Dr. Khaled Tobar (the new IWRM <strong>II</strong> Project<br />

Coordinator), on the project’s various activities. Eng. Tczap, Eng. Nabil, Dr. Wadie, and Dr.<br />

Moamen attended the meeting.<br />

A USAID/MWRI/IRG coordination meeting was held on September 11. Eng. Wafaa Faltaous,<br />

USAID (COTR), Dr. Khaled Toubar (Project Coordinator), Mr. Andrew Tczap (COP), Eng. Nabila<br />

Bahaa (ID), Eng. Tarek Awwad (IS), Eng. Nabil, and Dr. Wadie attended the meeting.<br />

MWRI (Groundwater (GW) Sector) and IRG staff met on September 15 to discuss conducting a<br />

GW database training course (Directorate Vision). Dr. Madeha (Head of GW), Eng. Ahmed Abd<br />

Elmaksoud (GW), Dr. Hanan (GW), Eng. Tczap and Eng. Nabil attended the meeting.<br />

Arrangements were agreed to and the course was conducted by the GW Sector staff in the last<br />

quarter of Year 3.<br />

4 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!