An MWRI (Planning Sector) project coordination meeting was held on September 18. Dr. Mohamed<br />

Motaleb (Head of Planning Sector), Dr. Khaled Toubar (Project Coordinator), Mr. Tczap, Eng.<br />

Nabil, Dr. Wadie, and Eng. Elfetyani (PS) attended the meeting.<br />

A coordination meeting for USAID and IRG staff was held on September 22. Eng. Wafaa Faltaous,<br />

USAID (COTR), Mr. Andrew Tczap (COP) and Eng. Nabil attended the meeting.<br />

The project initiated negotiations with El Zanaty & Associates on September 18 to conduct a<br />

farmers’ survey in the project area. Negotiations were completed and a fixed price purchase order<br />

was issued on September 29. The work has progressed according to schedule and the draft report<br />

was completed in mid-December. Review of the draft report is ongoing at the writing of this report.<br />

The head of the ID issued the decree No. 365 dated 28 September granting Eng. Mohamed Anwar<br />

Elbakry LWOP up to July 31, 2012 to work with the consultant in Mansoura RO as Water<br />

Resources Management Specialist. Eng. Mohamed started his assignment on LWOP on November<br />

20, 2011.<br />

Eng. Wafaa Faltaous, USAID (COTR), and Mr. Foaad Ellathy (USAID planning section) visited<br />

Elmataria IWMD on September 29. They attended a meeting with the district staff and with the<br />

BCWUAs in the Elmataria BCWUA No. (1) Office. They also visited a bridge located at Km 1.50 on<br />

branch canal No. 1 and a feeder to that canal from the Elganabia Elkhamsa canal, constructed by the<br />

BCWUA with IWMD supervision. Eng. Zenab Elraies, the head of the Central Directorate for Water<br />

Resources & Irrigation, Eng. Saad Elsaied Elsalam, General Director, Eng. Nabil, Eng. Elsaied Nagy<br />

and Eng. Akmal joined the trip.<br />

A Steering Committee meeting was held on October 2. The entire committee was in attendance<br />

except the head of the GW sector due to schedule conflict.<br />

Mr. Russell Misheloff, IRG HO Project Manager, started his assignment on October 1 and left Cairo<br />

on October 20. He assisted in preparing the Year 4 Work Plan and other reports that were in<br />

preparation.<br />

IRG staff coordination meeting was held on October 4 to prepare for the Year 4 Work Plan. The<br />

Regional Advisors (RAs) didn’t attend the meeting.<br />

The draft Year 4 Work Plan was distributed for review on October 17.<br />

The head of the ID issued the decree No. 449 dated October 19 granting Eng. Tamer Ibrahim<br />

Gomaa LWOP up to July 31, 2012 to work with the consultant in Zagazig RO as Water<br />

Management Specialist. Eng. Tamer started his assignment on LWOP on October 19, 2011.<br />

An IRG staff coordination meeting, including Regional Office staff, was held on October 24.<br />

A meeting between MWRI (Ministry Information Center – MIC) and IRG was held on October 24<br />

to discuss their capability in revising the IWMDs Digital Maps. Mr. Andy, Dr. Hesham, the head of<br />

the MIC, Eng. Nabil, and Eng. Sanaa attended the meeting. MIC indicated they have the capability<br />

and resources to assist with the digital maps and agreed to review one map to determine the effort<br />

required.<br />

Eng. Wafaa Faltaous, USAID COTR, attended the Qualubia October monthly meeting on October<br />

25, the undersecretary, the district’s directors, Eng. Nabil, Eng. Maher, and Eng. Abeer Salama<br />

attended the meeting.<br />

A Steering Committee meeting was held on October 31 to follow up the last meeting’s comments,<br />

Year 4 Work Plan and Workshop and other matters. The entire committee was in attendance except<br />

the head of the planning sector who was on travel outside Egypt. Review comments on the draft<br />

Work Plan were provided to the project.<br />

ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!