far along and budget allocated to the Tasks 1.2 and 1.4 was nominal to begin with, and some had<br />

been used at the time of de-scoping. A contract modification to reflect the revised scope of work<br />

has not been issued by USAID to date.<br />

On April 5 a USAID delegation visited West Belbeis Integrated Water Management District<br />

(IWMD). The delegation included John Crocker (Political Officer, U.S. Embassy Cairo), Catherine<br />

Picard (Environment and Natural Resource Officer), and David Roberts (Nile Program, Foreign<br />

Affairs Officer), in addition to John Pasch (Water Team Leader) and Eng. Wafaa Faltaous (COTR).<br />

Eng. Nabil Fawzi (IRG) accompanied the delegation.<br />

A Ministerial Decree was issued on April 14 reforming the IWRM <strong>II</strong> Steering Committee to include<br />

the following members: Head of Egyptian Public Authority for Drainage Projects (Chairman), Head<br />

of Irrigation Department, Head of Planning Sector (Project Coordinator), Head of Groundwater<br />

Sector, Head of the Minister's Technical Office, Head of Irrigation Sector, Undersecretary of Water<br />

Advisory Services, USAID representative (COTR), and IRGs Chief of Party.<br />

Long-Term Technical Assistance (LTTA), Senior Strategic Communication and Public Awareness<br />

Specialist Ms. Cheryl Groff’s one-year assignment was extended through June 2011. She completed<br />

her LTTA assignment and returned to the United States on June 30.<br />

In a second government reshuffle, H.E. Minister Dr. Hussein El-Atfy, resigned in July. Dr. Hesham<br />

Kandil, MWRI Head of the Nile Sector, was appointed as the new Minister on July 18. HE Minister<br />

Kandil issued a ministerial decree on August 9 appointing Dr. Khaled Toubar to the IWRM <strong>II</strong><br />

Steering Committee. Another decree was issued on August 16 assigning Dr. Toubar as the Project<br />

Coordinator in addition to his position as General Director for Design and Barrage Safety under the<br />

Reservoir and Grand Barrage Sector.<br />

The project started the year employing six MWRI engineers on Leave Without Pay (LWOP) working<br />

full time – two in the Cairo office and two each in the Zagazig and Mansoura Regional Offices. Dr.<br />

Moamen El Sharkawy and Eng. Amira Abdel Hady were assigned to the Cairo office. Eng. Ayman<br />

Shedid, Water Management Specialist and Eng. Soha Mostafa, Water Information Specialist, were<br />

assigned to the Zagazig Regional Office. Eng. Elbayoumi Ali Ez Eldeen, Water Management<br />

Specialist and Eng. Akmal Badie Henein, Water Information Specialist were assigned to the<br />

Mansoura Regional Office. The LWOP decree expired at the end of June and MWRI recalled all of<br />

them on July 14. This left the staff very short-handed. MWRI issued new LWOP decrees for Dr.<br />

Moamen and Engrs. Amira in August, and for Ayman and Akmal in September and all four returned<br />

to work as project staff. The other two field positions were filled by Eng. Tamer Gomaa in Zagazig<br />

in mid-October and Eng. Mohamed Bakry in Mansoura in mid-November. The project has been<br />

fully staffed since mid-October after 4 months of being short staffed.<br />

Andrew Tczap, IRG Home Office (HO) Senior Manager, completed a 15-day assignment (March 30<br />

–April 16) to prepare a management assessment of the project, assist with preparing Year 3 Work<br />

Plan, and assist with a budget review.<br />

Dr. Craig Anderson, Expat Institutional Development Specialist, completed a 22-day short-term<br />

technical assistance (STTA) assignment (March 30–April 28) to assist with preparing Year 3 Work<br />

Plan, assist with Task 1.3 Improvements in Water Productivity and Efficiency, and review the<br />

Updated Communications Plan.<br />

Firras Traish, IRG Project Coordinator/Procurement Officer completed a 12-day STTA assignment<br />

(May 19 –June 2) to review procurement and purchasing files.<br />

Dr. J. Fredericks (COP) was reassigned to the Home Office by IRG and he departed Egypt on May<br />

12. Andrew Tczap arrived Cairo on May 9 to take up the position of COP vacated by Dr.<br />

Fredericks.<br />

2 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)