Table 4 - IWRM <strong>II</strong> Implementation Indicators, Water Suppliers<br />
IWRM <strong>II</strong> M&E Indicators<br />
Task Indicator<br />
Cumulative Targets and Accomplishments<br />
Baseline<br />
Year 1 Year 2 Year 3 Year 4<br />
Units<br />
Target Actual Target Actual Target Actual Target Actual<br />
2.1 Regional Water Management Organizations<br />
2.1.a Business plan submitted to MWRI<br />
for approval<br />
0/1 0 0 0 1 0<br />
2.1.b Business plan implemented 0/1 0 0 0 0 0<br />
2.2 Formation and Development of Integrated Water Management Districts (IWMDs)<br />
2.2.a Number of IWMDs established<br />
with fully staffed senior positions<br />
Number 0 45 45 45 45 45 45 45<br />
2.1.b Number of IWMDs with completed<br />
integrated maintenance plans<br />
Number 0 0 0 45 45 45 45 45<br />
2.2.c Number of IWMDs with a training<br />
room established and equipped<br />
Number 0 20 0 45 45 45 45 45<br />
2.2.d Number of General Directorates<br />
with a computer training center Number 0 8 4 8 8 8 8 8<br />
established and equipped<br />
2.2.e Number of IWRM I IWMDs<br />
participating in coordination Number 27 27 27 27 27 27 27 27<br />
meetings<br />
2.3<br />
2.3.a<br />
Establishment of information Management Systems for Sustainable Water Resources Management<br />
Number of IWMDs with<br />
calibrations for all authorized Number 0 0 0 45 0 45 45 45<br />
inflow and outflow structures<br />
2.3.b Number of IWMDs with MISD<br />
installed and operational<br />
Number 0 0 0 45 0 45 45 45<br />
2.3.c Number of IWMDs with completed<br />
and approved water resource Number 0 0 0 0 0 45 0 45<br />
management plan<br />
2.3.d Number of IWMDs with water<br />
resource information systems Number 0 0 0 45 0 45 45 45<br />
installed and operational<br />
2.3.e Number of Branch Canals with<br />
flows monitored by IWMD<br />
Number 0 0 0 0 1 4 1 8<br />
2.4 Capacity Building of MWRI Personnel<br />
2.4.a Candidates selected Number 0 20 20 50 36 50 36<br />
2.4.b Candidates accepted by American<br />
University Cairo and local<br />
Number 0 20 15 50 20 50 21<br />
universities<br />
2.4.c Candidates graduated with M.S.<br />
degrees<br />
Number 0 0 0 0 2<br />