TASK 1.4: WASTE<strong>WATER</strong> REUSE<br />

Dr. Wadie Fahim Mankarious (LTTA, Senior Organization/Institutional Development Specialist) is<br />

the IRG coordinator for this task. Mr. Russell Misheloff, Senior Economist provided STTA. Eng.<br />

Sami Yacoub (Organization/ Institutional Development Specialist) provided STTA support and<br />

follow-up to the Global Development Alliance: Environmental Services for Improving Water<br />

Quality Management in Egypt (GDA).<br />

The following activities were carried out during the first quarter of year, prior to the Mid-Term<br />

Evaluation results:<br />

• A meeting was held with the Holding Company for Water & Waste Water (HCWW) Legal<br />

Committee chaired by Mr. Osama Shalaby to discuss the possiblity of a 1,000 feddan pilot<br />

wastewater reuse concession scheme. Dr. Wadie attended the meeting and briefed the<br />

Committee on the concept and its benefits. HCWW sent a portion of the meeting minutes<br />

indicating approval of going ahead with the concept. This task was de-scoped before the<br />

project could respond.<br />

• The USAID Mid-term Evaluation Team recommended that the project cease all further<br />

activity related to Task 1.4 and the project has complied.<br />

Task 1.4 PMP Indicators and Targets<br />

Task Indicator Units Baseline Year 1 Year 2 Year 3<br />

Target Actual Target Actual Target Actual<br />

1.4 Wastewater Reuse<br />

1.4.a<br />

1.4.b<br />

Feasibility plan submitted<br />

for approval<br />

Number of partnership<br />

agreements signed<br />

0/1 0 1 0 1 1 1 1<br />

Number 0 0 0 0 0 2 0<br />

TASK 2.1: REGIONAL <strong>WATER</strong> <strong>MANAGEMENT</strong><br />

ORGANIZATIONS (RWMO)<br />

Activity on this task was on hold at the beginning of the year. In compliance with a USAID Mid-<br />

Term Evaluation recommendation and concurrence of MWRI, the project ceased all further activity<br />

under this task.<br />

TASK 2.2: FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong><br />

<strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS<br />

Eng. Nabil Eng. Fawzi (LTTA, Senior Water Resources Management Specialist) is the coordinator<br />

for this task. Eng. Maher Khodary (LTTA, Senior Water Resources Management Specialist, Regional<br />

Advisor) is responsible for managing the task for the four Directorates and 26 IWMDs covered by<br />

the Zagazig Regional Office. Eng. El-Sayed Nagi (LTTA, Senior Water Resources Management<br />

Specialist, Regional Advisor) who was replaced by Eng. Ibraheem Farag in November is responsible<br />

for managing the task for the four Directorates and 19 IWMDs covered by the Mansoura Regional<br />

Office. Eng. Ayman Shedid and Eng. Soha Mostafa who was replaced by Eng. Tamer Gomaa<br />

provided technical assistance support to the Zagazig IWRM <strong>II</strong> Regional Office during Year 3. Eng.<br />

Elbayoumi Ali Ez Eldeen who was replaced by Eng. Mohamed Elbakry and Eng. Akmal Badie<br />

Henein provided technical assistance support to the Mansoura IWRM <strong>II</strong> Regional Office during Year<br />

3. Activities carried out during Year 3 include:<br />

ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 13