TASK 1.4: WASTE<strong>WATER</strong> REUSE<br />
Dr. Wadie Fahim Mankarious (LTTA, Senior Organization/Institutional Development Specialist) is<br />
the IRG coordinator for this task. Mr. Russell Misheloff, Senior Economist provided STTA. Eng.<br />
Sami Yacoub (Organization/ Institutional Development Specialist) provided STTA support and<br />
follow-up to the Global Development Alliance: Environmental Services for Improving Water<br />
Quality Management in Egypt (GDA).<br />
The following activities were carried out during the first quarter of year, prior to the Mid-Term<br />
Evaluation results:<br />
• A meeting was held with the Holding Company for Water & Waste Water (HCWW) Legal<br />
Committee chaired by Mr. Osama Shalaby to discuss the possiblity of a 1,000 feddan pilot<br />
wastewater reuse concession scheme. Dr. Wadie attended the meeting and briefed the<br />
Committee on the concept and its benefits. HCWW sent a portion of the meeting minutes<br />
indicating approval of going ahead with the concept. This task was de-scoped before the<br />
project could respond.<br />
• The USAID Mid-term Evaluation Team recommended that the project cease all further<br />
activity related to Task 1.4 and the project has complied.<br />
Task 1.4 PMP Indicators and Targets<br />
Task Indicator Units Baseline Year 1 Year 2 Year 3<br />
Target Actual Target Actual Target Actual<br />
1.4 Wastewater Reuse<br />
1.4.a<br />
1.4.b<br />
Feasibility plan submitted<br />
for approval<br />
Number of partnership<br />
agreements signed<br />
0/1 0 1 0 1 1 1 1<br />
Number 0 0 0 0 0 2 0<br />
TASK 2.1: REGIONAL <strong>WATER</strong> <strong>MANAGEMENT</strong><br />
ORGANIZATIONS (RWMO)<br />
Activity on this task was on hold at the beginning of the year. In compliance with a USAID Mid-<br />
Term Evaluation recommendation and concurrence of MWRI, the project ceased all further activity<br />
under this task.<br />
TASK 2.2: FORMATION AND DEVELOPMENT OF <strong>INTEGRATED</strong><br />
<strong>WATER</strong> <strong>MANAGEMENT</strong> DISTRICTS<br />
Eng. Nabil Eng. Fawzi (LTTA, Senior Water Resources Management Specialist) is the coordinator<br />
for this task. Eng. Maher Khodary (LTTA, Senior Water Resources Management Specialist, Regional<br />
Advisor) is responsible for managing the task for the four Directorates and 26 IWMDs covered by<br />
the Zagazig Regional Office. Eng. El-Sayed Nagi (LTTA, Senior Water Resources Management<br />
Specialist, Regional Advisor) who was replaced by Eng. Ibraheem Farag in November is responsible<br />
for managing the task for the four Directorates and 19 IWMDs covered by the Mansoura Regional<br />
Office. Eng. Ayman Shedid and Eng. Soha Mostafa who was replaced by Eng. Tamer Gomaa<br />
provided technical assistance support to the Zagazig IWRM <strong>II</strong> Regional Office during Year 3. Eng.<br />
Elbayoumi Ali Ez Eldeen who was replaced by Eng. Mohamed Elbakry and Eng. Akmal Badie<br />
Henein provided technical assistance support to the Mansoura IWRM <strong>II</strong> Regional Office during Year<br />
3. Activities carried out during Year 3 include:<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 13