Task 2.4 PMP Indicators and Targets<br />

Task Indicator Units Baseline Year 1 Year 2 Year 3<br />

2.4 Capacity Building of MWRI Personnel<br />

Target Actual Target Actual Target Actual<br />

2.4.a Candidates selected Number 0 20 20 50 36 50 36<br />

2.4.b<br />

2.4.c<br />

Candidates accepted by<br />

American University Cairo<br />

and local universities<br />

Candidates graduated with<br />

M.S. degrees<br />

Number 0 20 15 50 20 50 32<br />

Number 0 0 0 0 0 0 2<br />

MONITORING AND EVALUATION<br />

Dr. Wadie Fahim Mankarious (LTTA, Senior Organization/Institutional Development Specialist) is<br />

the coordinator for this Task. Dr. Mark Svendsen (IRG), Monitoring and Evaluation specialist,<br />

provides Expat STTA support. Activities carried out during Year 3 include:<br />

• The checklist for evaluating IWMD performance prepared and utilization of the checklist<br />

started.<br />

• Dr. Svendsen visited the project from July13-19 to provide STTA support to the project.<br />

• An addendum to the project PMP setting out a new set of indicators to measure the capacity<br />

and performance of BCWUAs and IWMDs was prepared by Dr. Svendsen and submitted to<br />

USAID.<br />

• Dr. Svendsen, Dr. Wadie, and Andrew Tczap met twice with the USAID COTR and Ms.<br />

Amani Selim, USAID Senior M&E Specialist, to discuss the PMP indicators in relation to the<br />

recommendations of the Mid-Term Evaluation. The new indicators related to organizational<br />

performance and the plan to monitor the indicators was presented, discussed, and approved<br />

at these meetings.<br />

• Dr. Abd El Motaleb, MWRI Coordinator, attended a debriefing by Dr. Svendsen. He<br />

supported the M&E activities, and requested that IWRM <strong>II</strong> draft a letter to be addressed to<br />

all IWMDs asking for support in obtaining requested data. Dr. Motaleb encouraged the<br />

project to continue introducing the concept of managing water resources based on volume<br />

instead of water level.<br />

• The M&E team discussed possible collaboration between IWRM <strong>II</strong> and CDIAS on M&E<br />

activities related to BCWUAs with Eng. Nagwa El Khashab, Chairperson of CDIAS. No<br />

decision was reached and the concept is under consideration.<br />

• IWRM <strong>II</strong> started to collect information on crop area, productivity, and farm gate prices in<br />

each district from the MALR Information Center for the summer 2009 and winter<br />

2009/2010 seasons. Work on utilization of the checklist for evaluating IWMD performance<br />

continued.<br />

• A purchase order with EL Zanaty Associates was signed for conducting a field survey of<br />

farmers and for focus group meetings with BCWUA boards. These will cover the IWRM <strong>II</strong><br />

area and the two IWRM I supported directorates in Lower Egypt. The survey was designed<br />

to be a follow-on to the baseline survey previously completed. The draft report of the study<br />

was submitted in mid-December and is presently under review.<br />

ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 19