Task 2.4 PMP Indicators and Targets<br />
Task Indicator Units Baseline Year 1 Year 2 Year 3<br />
2.4 Capacity Building of MWRI Personnel<br />
Target Actual Target Actual Target Actual<br />
2.4.a Candidates selected Number 0 20 20 50 36 50 36<br />
2.4.b<br />
2.4.c<br />
Candidates accepted by<br />
American University Cairo<br />
and local universities<br />
Candidates graduated with<br />
M.S. degrees<br />
Number 0 20 15 50 20 50 32<br />
Number 0 0 0 0 0 0 2<br />
MONITORING AND EVALUATION<br />
Dr. Wadie Fahim Mankarious (LTTA, Senior Organization/Institutional Development Specialist) is<br />
the coordinator for this Task. Dr. Mark Svendsen (IRG), Monitoring and Evaluation specialist,<br />
provides Expat STTA support. Activities carried out during Year 3 include:<br />
• The checklist for evaluating IWMD performance prepared and utilization of the checklist<br />
started.<br />
• Dr. Svendsen visited the project from July13-19 to provide STTA support to the project.<br />
• An addendum to the project PMP setting out a new set of indicators to measure the capacity<br />
and performance of BCWUAs and IWMDs was prepared by Dr. Svendsen and submitted to<br />
USAID.<br />
• Dr. Svendsen, Dr. Wadie, and Andrew Tczap met twice with the USAID COTR and Ms.<br />
Amani Selim, USAID Senior M&E Specialist, to discuss the PMP indicators in relation to the<br />
recommendations of the Mid-Term Evaluation. The new indicators related to organizational<br />
performance and the plan to monitor the indicators was presented, discussed, and approved<br />
at these meetings.<br />
• Dr. Abd El Motaleb, MWRI Coordinator, attended a debriefing by Dr. Svendsen. He<br />
supported the M&E activities, and requested that IWRM <strong>II</strong> draft a letter to be addressed to<br />
all IWMDs asking for support in obtaining requested data. Dr. Motaleb encouraged the<br />
project to continue introducing the concept of managing water resources based on volume<br />
instead of water level.<br />
• The M&E team discussed possible collaboration between IWRM <strong>II</strong> and CDIAS on M&E<br />
activities related to BCWUAs with Eng. Nagwa El Khashab, Chairperson of CDIAS. No<br />
decision was reached and the concept is under consideration.<br />
• IWRM <strong>II</strong> started to collect information on crop area, productivity, and farm gate prices in<br />
each district from the MALR Information Center for the summer 2009 and winter<br />
2009/2010 seasons. Work on utilization of the checklist for evaluating IWMD performance<br />
continued.<br />
• A purchase order with EL Zanaty Associates was signed for conducting a field survey of<br />
farmers and for focus group meetings with BCWUA boards. These will cover the IWRM <strong>II</strong><br />
area and the two IWRM I supported directorates in Lower Egypt. The survey was designed<br />
to be a follow-on to the baseline survey previously completed. The draft report of the study<br />
was submitted in mid-December and is presently under review.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 19