1. SUMMARY OF ACTIVITIES<br />
International Resource Group (IRG), under the USAID/Egypt Integrated Water Resources<br />
Management <strong>II</strong> Project (IWRM <strong>II</strong>), Contract No. EPP-I-00-04-00024-00 Task Order No. 06, is<br />
responsible for assisting the Government of Egypt (GOE) in promoting integrated water resources<br />
management. The period of performance of the project is from January 25, 2009 to September 30,<br />
2012.<br />
The purpose of this report is to present the status and performance of IWRM <strong>II</strong> for Year 3 covering<br />
the period from January to December 2011. This Annual Report summarizes the previous year’s<br />
activities and accomplishments against the respective Annual Work Plan indicators, and serves as the<br />
tool by which USAID/Egypt can monitor project performance. The report includes status of<br />
personnel and project activities, and summarizes services delivered and progress towards achieving<br />
results identified in the Project Monitoring Plan (PMP). It documents both successes and failures of<br />
the project interventions, and discusses reasons for shortcomings and recommends actions to<br />
overcome them. The Annual Report has the following content: summary; accomplishments during<br />
the year; planned activities for the following quarter (January – March 2012); and a section on<br />
problems, issues, and lessons learned.<br />
The following items have been included as annexes: Annex A: Monitoring and Evaluation (M&E)<br />
Plan Update, Annex B: Annual Financial Status Report, Annex C: List of Project Reports, Annex D:<br />
Status of Technical Assistance, Annex E: Training Report, and Annex F: Procurement Status Report.<br />
A summary of the activities and accomplishments for the Project Year 3 (January to December 2011)<br />
follows:<br />
Due to political unrest in Egypt, USAID declared an Ordered Departure for non-essential<br />
USAID/Egypt Contractors on February 2, 2011. The IRG IWRM <strong>II</strong> Chief of Party (COP) was<br />
considered essential and remained in Cairo. The IRG Cairo office remained open throughout with<br />
the exceptions of January 30 & 31, when it was deemed risky for staff to travel within Cairo. The<br />
Regional Offices in Zagazig and Mansoura remained open throughout. Although the offices<br />
remained open, progress was diminished due to interruption of travel at times and due to changes in<br />
government discussed below.<br />
As a result of a cabinet reshuffle, H.E. Minister Dr. Mohamed Nasr Allam, resigned on January 31.<br />
Dr. Hussein El-Atfy, Ministry of Water Resources and Irrigation (MWRI) Senior Undersecretary, was<br />
appointed as the new Minister. Eng. Fathy Abdel Maksoud El Gouielly, Head of Irrigation Sector,<br />
was appointed the new Chairman of Irrigation Department. Dr. Hussam El-Din Safwat Fahmy,<br />
Chairman of Drainage Authority (EPADP), was appointed the Head of the USAID/MWRI Steering<br />
Committee on 22 February. Dr. Mohamed Abdel Motaleb, Head of Planning sector was appointed as<br />
the IWRM <strong>II</strong> Coordinator.<br />
USAID initiated a Mid-Term Evaluation of the project in early January and it was mutually agreed to<br />
delay finalizing the Year 3 Work Plan until after the evaluation results were available. The evaluation<br />
team’s initial findings were presented verbally in separate meetings to HE Minister MWRI and<br />
MWRI Steering Committee Members and IRG staff on January 20. A draft report was issued on<br />
February 23. IRG submitted a written response to the Mid-Term Evaluation on March10. IRG’s<br />
Technical Assistance (TA) team held a meeting with USAID on March 20 to discuss the Mid-Term<br />
Evaluation draft report. IRG received the final Mid-Term Evaluation report on May 18. The<br />
Evaluation recommendations included de-scoping (no further activity) Tasks 1.2, 1.4, and 2.1. The<br />
Evaluation also recommended freezing Task 2.4 and not considering any additional candidates.<br />
MWRI and IRG accepted the recommendations and IRG adjusted the project implementation plan<br />
accordingly. The de-scoping did not have a significant impact on the budget. Task 1.4 was already<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 1