• Attend monthly water distribution meetings.<br />
TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />
The following activities are planned for next quarter:<br />
• Monitor progress of the trainees.<br />
• Provide financial and logistical support for trainees.<br />
MONITORING AND EVALUATION<br />
The following activities are planned for the next quarter:<br />
• Complete analysis of the farmer survey data and finalize the survey report.<br />
• Assemble relevant secondary M&E data from all project IWMDs.<br />
• Continue monitoring district performance profiles prepared by IWMDs.<br />
• Continue collection of secondary MALR agricultural data for E. Nile Delta available for 2009<br />
& 2010.<br />
• Complete collection of crop water requirement data from MISD database for year 2010 &<br />
2011.<br />
• Back calculate water delivery data from water level data at calibrated inflow/outflow<br />
equations for 2009 if possible.<br />
EDUCATION, COMMUNICATION, PUBLIC AWARENESS, AND PARTICIPATION<br />
The following activities are planned for the next quarter:<br />
• Support all training courses as needed.<br />
• Finalize high-value, low-water crop communication materials.<br />
• Collect, compile, and produce Success Stories.<br />
TRAINING<br />
The following training courses are planned for next quarter:<br />
ID Course Title Task Events Venue<br />
1.1.4.1 BCWUAs Women Board Members Strengthening TOT 1.1 7 Each Directorate<br />
2.2.4.1 Administration of Contract 2.2 7 Each Directorate<br />
2.2.4.2 Drainage Works 2.2 7 Each Directorate<br />
2.3.4.1 Water Budget / IWRM Plan 2.3 7 Each Directorate<br />
2.3.4.2 Information-based Water Management 2.3 7 Each Directorate<br />
2.3.4.3 Data Logger Maintenance 2.3 5 Each Directorate<br />
PROCUREMENT<br />
As stated previously there is budget available for additional procurement. MWRI was requested to<br />
submit a prioritized list of items they require for IWRM I and IWRM <strong>II</strong> districts/directorates. The<br />
list was not received as of writing this report although several items have been identified. Therefore,<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 25