30.01.2015 Views

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Attend monthly water distribution meetings.<br />

TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />

The following activities are planned for next quarter:<br />

• Monitor progress of the trainees.<br />

• Provide financial and logistical support for trainees.<br />

MONITORING AND EVALUATION<br />

The following activities are planned for the next quarter:<br />

• Complete analysis of the farmer survey data and finalize the survey report.<br />

• Assemble relevant secondary M&E data from all project IWMDs.<br />

• Continue monitoring district performance profiles prepared by IWMDs.<br />

• Continue collection of secondary MALR agricultural data for E. Nile Delta available for 2009<br />

& 2010.<br />

• Complete collection of crop water requirement data from MISD database for year 2010 &<br />

2011.<br />

• Back calculate water delivery data from water level data at calibrated inflow/outflow<br />

equations for 2009 if possible.<br />

EDUCATION, COMMUNICATION, PUBLIC AWARENESS, AND PARTICIPATION<br />

The following activities are planned for the next quarter:<br />

• Support all training courses as needed.<br />

• Finalize high-value, low-water crop communication materials.<br />

• Collect, compile, and produce Success Stories.<br />

TRAINING<br />

The following training courses are planned for next quarter:<br />

ID Course Title Task Events Venue<br />

1.1.4.1 BCWUAs Women Board Members Strengthening TOT 1.1 7 Each Directorate<br />

2.2.4.1 Administration of Contract 2.2 7 Each Directorate<br />

2.2.4.2 Drainage Works 2.2 7 Each Directorate<br />

2.3.4.1 Water Budget / IWRM Plan 2.3 7 Each Directorate<br />

2.3.4.2 Information-based Water Management 2.3 7 Each Directorate<br />

2.3.4.3 Data Logger Maintenance 2.3 5 Each Directorate<br />

PROCUREMENT<br />

As stated previously there is budget available for additional procurement. MWRI was requested to<br />

submit a prioritized list of items they require for IWRM I and IWRM <strong>II</strong> districts/directorates. The<br />

list was not received as of writing this report although several items have been identified. Therefore,<br />

ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!