• Financial and logistical support for M.S. Degree Program participants continued throughout<br />
the year.<br />
• TrailNet data was updated on a quarterly basis during the year.<br />
• A Study Tour to USA for nine MWRI Engineers selected from the IWRM areas of both<br />
IWRM I & IWRM <strong>II</strong> of the project was completed January 11-19, 2011. The project assisted<br />
USAID and their TA Contractor GETF with arrangements for the study tour. A reentry<br />
meeting was held at USAID on April 12 for the nine MWRI engineers who participated in<br />
the Study Tour.<br />
The USAID Mid-Term Evaluation recommended that no new participants be considered and that<br />
the remainder of this task be devoted to supporting the participants in place in the winter of 2011.<br />
The project is complying with that recommendation.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 17