Creation of the implementation indicators is simple and straightforward. Most are simply numbers of<br />

occurrences (e.g. “number of IWMDs with training centers established an equipped) which are<br />

summed across Districts and reported against targets.<br />

Target values have been established for the four years of the project for these indicators, together<br />

with a set of baseline values that represent pre-project conditions. In general, baseline values of the<br />

indicators used in this project are zero. Targets presented in the original PMP have been adjusted to<br />

reflect the recommendations of the USAID mid-term evaluation and new thinking based on<br />

experience in the first two years of implementation.<br />

IWRM <strong>II</strong> M&E Indicators<br />

Table 3 - IWRM <strong>II</strong> Implementation Indicators, Water Users<br />

Cumulative Targets and Accomplishments<br />

Task Indicator Units Baseline Year 1 Year 2 Year 3 Year 4<br />

1.1<br />

Target Actual Target Actual Target Actual Target Actual<br />

Formation and Development of Branch Canal Water User Associations (BCWUAs)<br />

1.1.a Number of IWMDs with staffed<br />

Water Advisory Teams<br />

Number 0 45 45 45 45 45 45 45<br />

1.1.b Number of GDs with staffed Water<br />

Advisory Teams<br />

Number 0 8 8 8 8 8 8 8<br />

1.1.c Share of planned BCWUAs<br />

established by Ministerial decree<br />

Percent 0 50 0 100 100 100 100 100<br />

1.1.d Share of BCWUAs with<br />

maintenance priorities and action Percent 0 0 0 50 0 100 100 100<br />

plans<br />

1.1.e Share of BCWUAs monitoring and<br />

reporting on Branch Canal water Percent 0 0 0 0 0 25 25 100<br />

supply<br />

1.2 Sustainable Local Financing for Canal and Drain Maintenance<br />

1.2.a Decree prepared and submitted<br />

for approval<br />

0/1 0 1 1 1 1<br />

1.2.b BCWUA cost sharing system<br />

guidelines submitted for approval<br />

0/1 0 1 0 1 0<br />

1.2.c Cost sharing system guidelines<br />

Number 0 0 0 0 0<br />

implemented on Branch Canals<br />

1.3 Improvements in Water Productivity and Efficiency<br />

1.3.a Number of farmers receiving<br />

training on High-Value Crops and Number 0 100 0 300 502 500 1125 800<br />

1.4<br />

water saving technology<br />

Wastwater Reuse<br />

1.4.a Feasibility plan submitted for<br />

approval<br />

0/1 0 1 0 1 1<br />

1.4.b Number of partnership<br />

agreements signed<br />

Number 0 0 0 0 0<br />

34 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)