TASK 2.3: ESTABLISHMENT OF INFORMATION <strong>MANAGEMENT</strong><br />

SYSTEMS FOR SUSTAINABLE <strong>WATER</strong> <strong>RESOURCE</strong><br />

<strong>MANAGEMENT</strong><br />

Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the coordinator for this<br />

Task. Eng. Ayman Shedid and Eng. Soha Mostafa who was replaced by Eng. Tamer Gomaa<br />

provided technical assistance support to the Zagazig IWRM <strong>II</strong> Regional Office during Year 3. Eng.<br />

Elbayoumi Ali Ez Eldeen who was replaced by Eng. Mohamed Elbakry and Eng. Akmal Badie<br />

Henein provided technical assistance support to the Mansoura IWRM <strong>II</strong> Regional Office during Year<br />

3. Dr. Tom S. Sheng (CADI), Water Resources Information Specialist, provided expatriate STTA<br />

support. Activities carried out during Year 3 include:<br />

• Maintenance support for the data loggers installed at 11 telemetry sites continued.<br />

Installation of eight additional data loggers procured in 2010 was completed. Procurement of<br />

additional eight data loggers was completed and inspected. Inspection surveys for<br />

installation of the eight data loggers were conducted and 4/8 were installed. A total of 27<br />

data loggers have been procured for MWRI by the project to date. Procurement of additional<br />

data loggers will take place in Year 4.<br />

• Under the MISD activity bi-weekly crop data for each branch canal is being collected by<br />

MALR and transferred to all 45 IWMDs.<br />

• Calibrations were completed at all sites during the year and review of the results is ongoing.<br />

Water Flow measurements continued at the 104 inflow/outflow sites to confirm and<br />

improve the calibration results.<br />

• Water Quality monitoring is ongoing at 289 monitoring sites. All IWMDs are collecting data<br />

and entering it into the data base. Some districts report that they utilize the results to shift or<br />

blend sources when quality is poor.<br />

• Water levels are being entered in the Water Level database in all 45 IWMDs. The eight<br />

Directorates are consolidating the data at the Directorate level. Only 37 of 45 IWMDs were<br />

calculating the water volume from the WL data base at the end of the year. In some cases,<br />

calibration equations have not been entered into the data base and in others the calculation<br />

of volume gives results that are not reasonable. The latter case is being investigated by the<br />

project and district staff.<br />

• Review and consolidation of the canal and drain network digital maps is on-going, 36 of 45<br />

IWMDs completed their maps consisting of 11 layers and are under review. The remaining<br />

IWMDs are all working to complete their maps.<br />

• Ground Water Monitoring Training course was completed (7/7 events). At request of the<br />

head of the Irrigation Department instructions to the Dakahlia undersecretary, the 13<br />

IWMDs in E. & W. Dakahlia included the unlicensed well data in the GW inventory.<br />

• The Digital Map Branch Canal Area Survey Training Course was completed (7/7 events).<br />

• The Ground Water Data Base training course was completed, 7 events.<br />

• Water Level & Complaints Follow up training was completed.<br />

• Complaints are being entered in the complaints databases in all 45 IWMDs. The directorates<br />

are consolidating the data.<br />

• Eng. Osama Mahmoud and Eng Mohamed Hassan from MWRI’s Information Center (MIC)<br />

visited the directorates and all IWMDs to follow up on resolving software problems with the<br />