water level and complaints databases, and to provide refresher training on the data bases<br />
during the 8 – 22 August period however analysis and use of the data in decision making is<br />
not being done..<br />
• Water Recourses Inventory training course was completed, 7 events.<br />
• Ground Water Monitoring Follow up training course was completed, 5 events.<br />
• Ground Water Database (Directorate Version) was completed, 5 events.<br />
• Water Quality Monitoring follow up training course is ongoing, 4/7 event completed.<br />
• Water Distribution Team coordination meetings held, 17 events, attended by the General<br />
Directorate’s Water Distribution teams in addition to representatives from the<br />
undersecretary’s technical offices. Eng. Nabil Fawzi attended the meetings; Dr. Khaled<br />
Toubar (project coordinator) attended some of the meetings.<br />
Task 2.3 PMP Indicators and Targets<br />
Year 1 Year 2 Year 3<br />
Task Indicator Units Baseline Target Actual Target Actual Target Actual<br />
2.3 Establishment of information Management Systems for Sustainable Water Resources Management<br />
2.3.a Number of IWMDs with<br />
calibrations for all<br />
authorized inflow and<br />
Number 0 0 0 45 0 45 45<br />
outflow structures<br />
2.3.b Number of IWMDs with<br />
MISD installed and Number 0 0 0 45 0 45<br />
45<br />
operational<br />
2.3.c Number of IWMDs with<br />
completed and<br />
approved water<br />
Number 0 0 0 0 0 45 0<br />
resource management<br />
plan<br />
2.3.d Number of IWMDs with<br />
water resource<br />
information systems<br />
Number 0 0 0 45 0 45 45<br />
installed and operational<br />
2.3.e Number of branch<br />
canals with flows Number 0 0 0 0 1 2 1<br />
monitored by IWMD<br />
1. All systems the project is responsible for have been installed. The ADSL service that MWRI is<br />
responsible for is lacking at 18 of the 45 districts.<br />
TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />
Dahlia Hamdy (LTTA, Training Specialist) is the coordinator for this Task. Activities carried out<br />
during Year 3 include:<br />
• A total of 21 persons have participated in the M.S. degree program (seven at American<br />
University Cairo (AUC) and 14 at local universities) as shown in the table below.<br />
• Two participants have completed their master degree program at local universities bringing<br />
the present total enrollment in the local university program to 12 persons.<br />
• In the AUC M.S. Degree program, seven persons are currently enrolled: Environmental<br />
Engineering (two persons), Master of Engineering (four persons), and Intensive English (one<br />
person).<br />
16 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)