water level and complaints databases, and to provide refresher training on the data bases<br />

during the 8 – 22 August period however analysis and use of the data in decision making is<br />

not being done..<br />

• Water Recourses Inventory training course was completed, 7 events.<br />

• Ground Water Monitoring Follow up training course was completed, 5 events.<br />

• Ground Water Database (Directorate Version) was completed, 5 events.<br />

• Water Quality Monitoring follow up training course is ongoing, 4/7 event completed.<br />

• Water Distribution Team coordination meetings held, 17 events, attended by the General<br />

Directorate’s Water Distribution teams in addition to representatives from the<br />

undersecretary’s technical offices. Eng. Nabil Fawzi attended the meetings; Dr. Khaled<br />

Toubar (project coordinator) attended some of the meetings.<br />

Task 2.3 PMP Indicators and Targets<br />

Year 1 Year 2 Year 3<br />

Task Indicator Units Baseline Target Actual Target Actual Target Actual<br />

2.3 Establishment of information Management Systems for Sustainable Water Resources Management<br />

2.3.a Number of IWMDs with<br />

calibrations for all<br />

authorized inflow and<br />

Number 0 0 0 45 0 45 45<br />

outflow structures<br />

2.3.b Number of IWMDs with<br />

MISD installed and Number 0 0 0 45 0 45<br />

45<br />

operational<br />

2.3.c Number of IWMDs with<br />

completed and<br />

approved water<br />

Number 0 0 0 0 0 45 0<br />

resource management<br />

plan<br />

2.3.d Number of IWMDs with<br />

water resource<br />

information systems<br />

Number 0 0 0 45 0 45 45<br />

installed and operational<br />

2.3.e Number of branch<br />

canals with flows Number 0 0 0 0 1 2 1<br />

monitored by IWMD<br />

1. All systems the project is responsible for have been installed. The ADSL service that MWRI is<br />

responsible for is lacking at 18 of the 45 districts.<br />

TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />

Dahlia Hamdy (LTTA, Training Specialist) is the coordinator for this Task. Activities carried out<br />

during Year 3 include:<br />

• A total of 21 persons have participated in the M.S. degree program (seven at American<br />

University Cairo (AUC) and 14 at local universities) as shown in the table below.<br />

• Two participants have completed their master degree program at local universities bringing<br />

the present total enrollment in the local university program to 12 persons.<br />

• In the AUC M.S. Degree program, seven persons are currently enrolled: Environmental<br />

Engineering (two persons), Master of Engineering (four persons), and Intensive English (one<br />

person).<br />

16 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)