Practically all of the required commodities for IWMDs and Directorates were procured at the end of<br />
Year 2 at less than the budget allocated to this activity. Discussions were held early in Year 3<br />
regarding how to use the remaining budget but no consensus was reached. Therefore procurement<br />
during Year 3 consisted of purchasing a few items and planning for completing the procurement in<br />
Year 4. Activities carried out during the Year 3 include:<br />
• Procurement in accordance with the procurement plan continued.<br />
• Eight additional data loggers (8) and modems (6) were procured, delivered, and installation<br />
was completed for four of them at the end of the year.<br />
• One air conditioner was procured for the Qualubiya Directorate Meeting Room.<br />
• Books on high value crops were procured from MALR for distribution to DCWUAs.<br />
• Equipment repairs and purchase of consumables was carried out for IWMDs and<br />
Directorates.<br />
• Computer maintenance tool kits were procured for all 45 IWMDs and eight Directorates.<br />
• Give-away with the USAID Hand-in-Hand logo promotional items were designed, produced<br />
and distributed.<br />
Status of the procurement is shown Annex F: Procurement Status Report.<br />
22 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)