INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...
INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...
INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
the demo site for types of irrigation improvement systems. Dr. El Gendy promised to<br />
discuss the financial mechanism with the MALR Team. Due to unrest and changes of<br />
MALR leaders the process stopped.<br />
• The project had a meeting with Dr. Mohamed El Garhy, Head of Ag. Extension Sector,<br />
MALR. Dr. El Garhy accepted to enroll the BCWUAs in the SMS and Call Center services<br />
of MALR. Quick Service/Vodafone is the responsible firm for this service with MALR. A<br />
meeting with Quick Service/Vodafone Chairperson was conducted and arrangements to<br />
enroll the 620 BCWUAs board members in the Ag. Extension services were discussed. The<br />
project guided Vodafone for direct contact with the BCWUAs through the Ag. Cooperatives.<br />
• The project received an unsolicited request from El Maksar BCWUA to conduct a seminar<br />
on Water Conservation technologies and new irrigation systems. The seminar was scheduled<br />
to be on 25 October. Originally scheduled for one BCWUA to attend the seminar, another<br />
five BCWUAs from West Belbeis IWMD requested to participate and were accommodated.<br />
The seminar was conducted in Cairo and the project arranged for participants to visit the<br />
SAHARA Agricultural Exhibit that was going on in Nasr City.<br />
• USAID hosted a meeting involving IWRM <strong>II</strong>/IRG and MUCIA to discuss the possibility of<br />
collaboration and reduction of duplication. Eng. Wafaa and Dr. Abu El Wafa from USAID,<br />
Mr. Andy Tczap and Dr. Wadie from IRG, and Dr. Mohamed Samy, COP MUCIA,<br />
participated. IRG sent MUCIA the information on BCWUAs in East Delta Governorates<br />
requested during the meeting.<br />
• Year 4 Work Plan was prepared and presentations given at the annual workshop in Ain<br />
Sukhna. West Belbeis District Manager presented findings of the pilot activity and its impact<br />
on cropping pattern change and water savings.<br />
• A video on HVCs was produced and copies distributed to Directorates, IWMDs, and Ag.<br />
Districts.<br />
• It was planned to have a workshop for Buyers, Suppliers, and Bankers to be held in Cairo.<br />
The project started making arrangements by meeting with Eng. Yousri Tinawy, General<br />
Manager, Chamber of Food Industries (CFI) concerning the participants from CFI<br />
companies and a meeting at MALR with Dr. Assem Shaltout, Chairman of Union of<br />
Producers & Exporters of Horticultural Crops (UPEHC) for preparing the list of invitees<br />
from their association. Although planning had already begun, it was jointly decided with<br />
MWRI to cancel the event.<br />
• At the request of USAID, Dr. Wadie met with ACDI VOCA on June 27 to discuss<br />
common interests and the possibility of ACDI VOCA continuing the Task 1.3 activities<br />
upon completion of IWRM <strong>II</strong>. No decisions were taken as this would require a modification<br />
of ACDI VOCAs contract.<br />
Task 1.3 PMP Indicators and Targets<br />
Task<br />
Indicator Units Baseline Year 1 Year 2 Year 3<br />
Target Actual Target Actual Target Actual<br />
1.3 Improvements in Water Productivity and Efficiency<br />
1.3.a<br />
Number of farmers<br />
receiving training on<br />
High-Value Crops and<br />
water-saving technology<br />
Number 0 100 0 300 502 500 1,125<br />
12 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)