30.01.2015 Views

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

the demo site for types of irrigation improvement systems. Dr. El Gendy promised to<br />

discuss the financial mechanism with the MALR Team. Due to unrest and changes of<br />

MALR leaders the process stopped.<br />

• The project had a meeting with Dr. Mohamed El Garhy, Head of Ag. Extension Sector,<br />

MALR. Dr. El Garhy accepted to enroll the BCWUAs in the SMS and Call Center services<br />

of MALR. Quick Service/Vodafone is the responsible firm for this service with MALR. A<br />

meeting with Quick Service/Vodafone Chairperson was conducted and arrangements to<br />

enroll the 620 BCWUAs board members in the Ag. Extension services were discussed. The<br />

project guided Vodafone for direct contact with the BCWUAs through the Ag. Cooperatives.<br />

• The project received an unsolicited request from El Maksar BCWUA to conduct a seminar<br />

on Water Conservation technologies and new irrigation systems. The seminar was scheduled<br />

to be on 25 October. Originally scheduled for one BCWUA to attend the seminar, another<br />

five BCWUAs from West Belbeis IWMD requested to participate and were accommodated.<br />

The seminar was conducted in Cairo and the project arranged for participants to visit the<br />

SAHARA Agricultural Exhibit that was going on in Nasr City.<br />

• USAID hosted a meeting involving IWRM <strong>II</strong>/IRG and MUCIA to discuss the possibility of<br />

collaboration and reduction of duplication. Eng. Wafaa and Dr. Abu El Wafa from USAID,<br />

Mr. Andy Tczap and Dr. Wadie from IRG, and Dr. Mohamed Samy, COP MUCIA,<br />

participated. IRG sent MUCIA the information on BCWUAs in East Delta Governorates<br />

requested during the meeting.<br />

• Year 4 Work Plan was prepared and presentations given at the annual workshop in Ain<br />

Sukhna. West Belbeis District Manager presented findings of the pilot activity and its impact<br />

on cropping pattern change and water savings.<br />

• A video on HVCs was produced and copies distributed to Directorates, IWMDs, and Ag.<br />

Districts.<br />

• It was planned to have a workshop for Buyers, Suppliers, and Bankers to be held in Cairo.<br />

The project started making arrangements by meeting with Eng. Yousri Tinawy, General<br />

Manager, Chamber of Food Industries (CFI) concerning the participants from CFI<br />

companies and a meeting at MALR with Dr. Assem Shaltout, Chairman of Union of<br />

Producers & Exporters of Horticultural Crops (UPEHC) for preparing the list of invitees<br />

from their association. Although planning had already begun, it was jointly decided with<br />

MWRI to cancel the event.<br />

• At the request of USAID, Dr. Wadie met with ACDI VOCA on June 27 to discuss<br />

common interests and the possibility of ACDI VOCA continuing the Task 1.3 activities<br />

upon completion of IWRM <strong>II</strong>. No decisions were taken as this would require a modification<br />

of ACDI VOCAs contract.<br />

Task 1.3 PMP Indicators and Targets<br />

Task<br />

Indicator Units Baseline Year 1 Year 2 Year 3<br />

Target Actual Target Actual Target Actual<br />

1.3 Improvements in Water Productivity and Efficiency<br />

1.3.a<br />

Number of farmers<br />

receiving training on<br />

High-Value Crops and<br />

water-saving technology<br />

Number 0 100 0 300 502 500 1,125<br />

12 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!