30.01.2015 Views

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

INTEGRATED WATER RESOURCE MANAGEMENT II - LIFE-IWRMII ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EDUCATION, COMMUNICATION, PUBLIC AWARENESS AND PARTICIPATION<br />

Cheryl Groff (Senior Strategic Communication Specialist) was the IRG coordinator for this Task.<br />

She was supported by Mr. Abdel Bary on a short-term consulting basis when needed. Ms. Groff<br />

completed her assignment on June 30 and Mr. Bary will continue to provide short-term consulting<br />

services to the project as needed in Year 4. To the extent possible she worked in collaboration with<br />

the MWRI Water Communication Unit (WCU). Activities carried out during Year 2 include:<br />

• Give-away promotional items with the USAID Hand-in-Hand logo were produced and<br />

distributed.<br />

• Updating of the IWRM <strong>II</strong> website (http://iwrm2eg.org) continued during the year.<br />

• A Stakeholder Assessment was conducted to assess awareness product needs and<br />

effectiveness of the communications program conducted to date. Results were used to<br />

prepare the communications work plan for Year 4.<br />

• An eight-page newspaper supplement to celebrate World Environment Day was designed,<br />

produced and included in every issue of Al Ahram newspaper issued on June 8.<br />

• Continued preparation of awareness materials to support Task 1.3. A 12-page newspaper<br />

targeted to BCWUAs members, IWMD staff, and local population, and a 15- minute video<br />

for farmers was completed in the year. Production of a guide for water conservation<br />

technologies oriented to IWMD staff for use with BCWUA members started and will be<br />

completed in early 2012. Design of a poster on water conservation technologies targeted to<br />

farmers was initiated with completion planned for early 2012.<br />

• The IWRM East Delta map produced and distributed to all Directorates, Under Secretaries,<br />

and IWMDs in Year 2 was updated.<br />

• Periodic field visits to IWMDs and BCWUAs continued throughout the year to observe<br />

training, discuss communication needs, encourage IWMD staff, and initiate gathering of<br />

success stories for further dissemination.<br />

• 10-week (2 session/week) training for five WCU staff on the video editing program, Final<br />

Cut Pro, was completed in January 2011.<br />

TRAINING<br />

Dahlia Hamdy (LTTA, Training Specialist) is coordinator for this component. She was assisted by<br />

Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist), Dr. Wadie Fahim<br />

Mankarious (LTTA Senior Organization/Institutional Development Specialist) and the IWRM <strong>II</strong><br />

Regional Office staff. Activities carried out during Year 3 include:<br />

• Updated and supported the IWRM <strong>II</strong> Training Work Plan for Year 3.<br />

• Organized all training courses and prepared provider POs as required.<br />

• Organized and sponsored the Y4 Annual Workplan Workshop held on November 16-18,<br />

2011 at the Movenpick El Sokhna Resort.<br />

• Updated TraiNet on a quarterly basis.<br />

• Assisted in arrangements for a Study Tour to the United States sponsored and arranged by<br />

USAID for nine persons representing IWM Directorates and Districts from both phases of<br />

the project, IWRM I and IWRM <strong>II</strong>. The study tour was successfully conducted from 11-19<br />

January 2011.<br />

• Prepared Training Work Plan for Year 4.<br />

20 ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!