PERFORMANCE MONITORING PLAN (PMP)<br />
The original Performance Monitoring Plan 1 (PMP)<br />
of the project was produced in July 2009 to guide<br />
the M&E program for the project. Its purpose<br />
was (a) to provide feedback to project managers<br />
during project implementation and (b) to provide a<br />
comprehensive and coherent information base<br />
which can be used to assess project outcomes.<br />
Definitions of some basic terms used in this report<br />
are shown in the box at right. More detail can be<br />
found in the PMP.<br />
The original PMP employed two types of<br />
indicators. Implementation (Process) indicators<br />
monitor the progress of the project. They deal<br />
with the pace of activities undertaken by the<br />
project. Outcome (Results) indicators assess the<br />
cumulative effects of project activities on the<br />
project’s objectives.<br />
M&E DEFINITIONS<br />
A goal is a broad statement of what a program<br />
would like to accomplish. It portrays a positive<br />
future condition.<br />
Objectives are specific, measurable, appropriate,<br />
realistic, and time-bound statements describing<br />
what the project hopes to accomplish.<br />
Indicators are objectively measurable gauges of<br />
progress toward achieving an objective or<br />
measuring the impact of a specific intervention.<br />
Targets are specific values of indicators that the<br />
program wishes to achieve through its actions.<br />
A baseline provides a starting point from which<br />
to measure progress.<br />
AMENDMENT OF THE PMP<br />
In early 2011, USAID conducted a Mid-term Evaluation of the IWRM <strong>II</strong> project. The final report of<br />
this evaluation, dated May 2011, contained a number of conclusions and recommendations that<br />
affected the original project’s performance monitoring and evaluation (M&E) activities. In response<br />
to the recommendations made in the evaluation report the project developed an addendum to the<br />
PMP to add a new class of indicators; Organizational indicators..<br />
The amended PMP now includes three classes of indicators. The first comprises implementation<br />
indicators, which report progress in implementing project tasks. The second comprises outcome<br />
indicators, which measure the degree of<br />
achievement of overall project objectives. These<br />
outcome indicators reflect the combined effects<br />
of the individual project tasks. The third class of<br />
indicators, here termed organizational indicators,<br />
measures changes in the capacity of two key<br />
organizations being developed and strengthened<br />
under the project – Branch Canal Water User<br />
Associations (BCWUAs) and Integrated Water<br />
Management Districts (IWMDs).<br />
The organizational indicators for BCWUAs are:<br />
• Governance processes<br />
• Accountability and participation<br />
• Operational performance<br />
o Water distribution<br />
o Maintenance<br />
o Conflict resolution<br />
INDICATOR CLASSES<br />
• Implementation indicators measure the inputs<br />
provided by the project to accomplish desired<br />
change<br />
• Organizational indicators measure the capacity<br />
and performance of the organizations which<br />
are key actors in the desired change process<br />
• Outcome indicators measure the combined<br />
results of project inputs and interventions<br />
relative to overall project objectives<br />
1 IRG. 2009. Performance Monitoring Plan, Report no. 6. Cairo: MWRI, IWRM <strong>II</strong> project.<br />
ANNUAL REPORT YEAR 3 (JANUARY – DECEMBER 2011) 32