A300 MEM<br />
Captain<br />
First Officer<br />
Average BLG CH 73:06 73:06<br />
RLG CH 70:15 70:15<br />
R-day value CH 4:41 4:41<br />
# of Regular Lines 255 (62%) 255 (67%)<br />
# of Secondary Lines 74 (18%) 51 (13%)<br />
# of Reserve Lines 82 (20%) 76 (20%)<br />
Total # of Lines 411 382<br />
Total CH Available (no c/o) 19487 19487<br />
Avg CH/Rday 15.8 17.0<br />
Carry-in CH from Feb 875 875<br />
Feb CH carry-in to Total CHs 4.4% 4.4%<br />
Disputes: None<br />
PSIT Notes:<br />
July is a four week month this year with a holiday on the first day of the bid month. This affected the carry in credit<br />
available for last month and also resulted in a shorter week for building the first week. With the seasonal shorter<br />
flight times to the west coast, several cities are now a short layover on the day-side and a 36 hour layover on the<br />
night side. This enabled us to build more contiguous lines for these cities. Other 3 and even 4 leg sequences, 24 hour<br />
layovers, and the many un-turnable pairings are creating more departures per line and adversely affecting the overall<br />
quality of the bidpack. We are attempting to build lines in preparation for the pending NPRM rule changes. If you<br />
encounter any alertness issues please file a POR and Scheduling Committee PIREP.<br />
The PM out and backs were missing the first day in the first week due to the Fourth holiday so we had to build them<br />
a little different to get them up to the proper BLG.<br />
We appreciate the feedback we’re receiving from many of you each month. Please know your comments, good or<br />
bad, are welcome. The Scheduling Committee PIREP is our primary means of tracking issues since the company<br />
doesn’t share reports with us. Therefore, please submit a Scheduling Committee PIREP anytime you submit a<br />
Company Pilot Ops Report and then please CC the report to us here at the PSIT via email. This is the only way we<br />
can track data on current issues with any reliability. As always, we welcome your input and feedback on any trip<br />
that you operate.<br />
In Unity,<br />
Mike Pearcy<br />
Chip Fox<br />
Robin Sebasco