Exhibits Vol 2 - Independent Pilots Association
Exhibits Vol 2 - Independent Pilots Association
Exhibits Vol 2 - Independent Pilots Association
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
B757 MEM<br />
Captain<br />
First Officer<br />
Average BLG CH 75+00 75+00<br />
RLG CH 72+00 72+00<br />
R-day value CH 4+48 4+48<br />
# of Regular Lines 80 (73%) 80 (75%)<br />
# of Secondary Lines 23 (14%) 19 (12%)<br />
# of Reserve Lines 19 (13%) 18 (13%)<br />
Total # of Lines 102 97<br />
Total CH Available (no c/o) 6345 6345<br />
Avg CH/Rday 22.3 23.5<br />
Carry-in CH from Mar 511 511<br />
% of carry-in to Total CHs 7.75% 7.75%<br />
Disputes: None<br />
PSIT Notes:<br />
The Average BLG target remains at a comfortably high 75 CH. We say that meaning that targets any higher would<br />
begin to mean adding unmatched and unconnected filler pairings to “natural” lines. By next month, we hope to have<br />
a clearer picture of how fast the CGN base will stand up and what it might mean for the domestic 757 in terms of<br />
BLG averages in the short term.<br />
We are still trying to work with the company to improve the EMEA lines which have been trending downhill. Our<br />
precepts for those pairings are to mix BUD with night BSL for the shortest duty period, keep pure the day BSL,<br />
BCN, and MUC lines, swap out the expiring crews as they pass through CDG, and avoid mid-trip deadheads on the<br />
weekend layovers. In addition, we are trying to keep the optimizer from choosing poor ocean crossing deadheads on<br />
planes with substandard first/business class seating.<br />
The Thurs/Fri day GFK issue was fixed by the company and those lines now build correctly. In fact, that’s our pick<br />
city of the month. Look at lines 56 and 57 for a day flying weekend line. The weekend starts with the Saturday<br />
afternoon flight instead of the usual Saturday morning. A walk along the Red River of the North followed by a cool<br />
one at the Blue Moose Lodge is a wonderful way to spend a July day on the company’s dime!<br />
We appreciate the feedback we’re receiving from many of you each month. Please know your comments, good and<br />
bad, are welcome. The Scheduling Committee PIREP is our primary means of tracking issues since the company<br />
doesn’t share reports with us. Therefore, please submit a Scheduling Committee PIREP anytime you submit a<br />
Company Pilot Ops Report and then please CC the report to us here at the PSIT via email. This is the only way we<br />
can track data on current issues with any reliability. As always, we welcome your input and feedback on any trip<br />
that you operate.<br />
In Unity,<br />
J.D. Oliver<br />
Paul Hanson