02.02.2015 Views

Exhibits Vol 2 - Independent Pilots Association

Exhibits Vol 2 - Independent Pilots Association

Exhibits Vol 2 - Independent Pilots Association

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B757 MEM<br />

Captain<br />

First Officer<br />

Average BLG CH 75+00 75+00<br />

RLG CH 72+00 72+00<br />

R-day value CH 4+48 4+48<br />

# of Regular Lines 80 (73%) 80 (75%)<br />

# of Secondary Lines 23 (14%) 19 (12%)<br />

# of Reserve Lines 19 (13%) 18 (13%)<br />

Total # of Lines 102 97<br />

Total CH Available (no c/o) 6345 6345<br />

Avg CH/Rday 22.3 23.5<br />

Carry-in CH from Mar 511 511<br />

% of carry-in to Total CHs 7.75% 7.75%<br />

Disputes: None<br />

PSIT Notes:<br />

The Average BLG target remains at a comfortably high 75 CH. We say that meaning that targets any higher would<br />

begin to mean adding unmatched and unconnected filler pairings to “natural” lines. By next month, we hope to have<br />

a clearer picture of how fast the CGN base will stand up and what it might mean for the domestic 757 in terms of<br />

BLG averages in the short term.<br />

We are still trying to work with the company to improve the EMEA lines which have been trending downhill. Our<br />

precepts for those pairings are to mix BUD with night BSL for the shortest duty period, keep pure the day BSL,<br />

BCN, and MUC lines, swap out the expiring crews as they pass through CDG, and avoid mid-trip deadheads on the<br />

weekend layovers. In addition, we are trying to keep the optimizer from choosing poor ocean crossing deadheads on<br />

planes with substandard first/business class seating.<br />

The Thurs/Fri day GFK issue was fixed by the company and those lines now build correctly. In fact, that’s our pick<br />

city of the month. Look at lines 56 and 57 for a day flying weekend line. The weekend starts with the Saturday<br />

afternoon flight instead of the usual Saturday morning. A walk along the Red River of the North followed by a cool<br />

one at the Blue Moose Lodge is a wonderful way to spend a July day on the company’s dime!<br />

We appreciate the feedback we’re receiving from many of you each month. Please know your comments, good and<br />

bad, are welcome. The Scheduling Committee PIREP is our primary means of tracking issues since the company<br />

doesn’t share reports with us. Therefore, please submit a Scheduling Committee PIREP anytime you submit a<br />

Company Pilot Ops Report and then please CC the report to us here at the PSIT via email. This is the only way we<br />

can track data on current issues with any reliability. As always, we welcome your input and feedback on any trip<br />

that you operate.<br />

In Unity,<br />

J.D. Oliver<br />

Paul Hanson

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!