08.02.2015 Views

the georgia crime information center operating manual - GBI LMS

the georgia crime information center operating manual - GBI LMS

the georgia crime information center operating manual - GBI LMS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CANCEL<br />

Cancel messages remove entire records from GCIC/NCIC files that are no<br />

longer valid, cannot be supported by documentation, or cannot be<br />

modified to make <strong>the</strong> record correct. Only <strong>the</strong> originating agency can<br />

authorize <strong>the</strong> cancellation of a record. Cancel records when:<br />

• A record is entered incorrectly and cannot be modified. The record<br />

must be re-entered using <strong>the</strong> correct <strong>information</strong>.<br />

• Documentation (warrants, reports of missing persons, <strong>the</strong>ft reports,<br />

etc.) no longer exists to support <strong>the</strong> record.<br />

SUPPLEMENTAL RECORD ENTRY<br />

A supplemental record is used to add additional identifiers to an existing<br />

record. Only <strong>the</strong> agency that entered <strong>the</strong> original record may add<br />

additional identifiers to a record.<br />

7 Nlets<br />

The International Justice and Public Safety Network (Nlets) sole purpose is to<br />

provide for <strong>the</strong> interstate and/or interchange of criminal justice related <strong>information</strong>.<br />

Nlets is a computerized, high-speed message switching system created for and<br />

dedicated to <strong>the</strong> criminal justice community.<br />

8 MAINTENANCE CONTRACTS<br />

All agencies with CJIS network devices must have current maintenance contracts<br />

with appropriate vendors for <strong>the</strong> data communications equipment that connect to <strong>the</strong><br />

CJIS network. Maintenance contracts ensure that equipment will be repaired as<br />

required and that malfunctions will not adversely affect <strong>the</strong> CJIS network service to<br />

your agency or o<strong>the</strong>r CJIS agencies.<br />

GCIC Operating Manual<br />

Introduction<br />

Rev. 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!