<strong>Verde</strong> <strong>Potash</strong> Plc 14-3<br />
Cerrado <strong>Verde</strong> Project<br />
<strong>NI</strong> <strong>43</strong>-<strong>101</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong><br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Surface runoff studies - comprising the analysis of the physiographic features of the basin<br />
and its coverage;<br />
Determination of the Project Flow - shall be developed according to the Rational Method;<br />
Surface Runoff Coefficient - shall be considered depending on the type of area to be<br />
drained and surface coverage;<br />
Concentration Time - shall be calculated using the Kirpich formula;<br />
Rainfall intensity - shall be calculated for the rainfall post of the region;<br />
Rainfall Calculation - rain duration (tc) = 2.0 hours shall be adopted;<br />
Precipitation per square meter - the duration of rain (tc) = 2.0 hours shall be adopted;<br />
Precipitation per square meter that drains - the runoff coefficient = 0.90 shall be adopted;<br />
and<br />
Time Period of Return and Recurrence - (TR) = 10 years.<br />
14.4 Buildings and Ancillary Facilities<br />
There are no buildings or other facilities on the property, besides a rented small shelter for field<br />
activities support in the city of Matutina, and the main office in Brazil in Belo Horizonte. Plant,<br />
Mill, office, and mine building will be constructed as part of the mine development in the area.<br />
14.5 Potential Processing Plant Sites<br />
Among the several possibilities for site location, <strong>Verde</strong> is considering to install the plant close to<br />
Matutina, a small town close to the City of Sao Gotardo, which is a local pole. Two sites are<br />
being considered, Target 7 and Funchal Norte Target.<br />
14.6 Potential Tailings Storage Area<br />
Tailings from process are generated due to:<br />
Inadequate particle size, as the product has to be produced in a 2-4mm diameter range.<br />
Tailings are those materials which do not comply with such specification, mainly dust<br />
from pellet handling; and<br />
Unburned or not sufficiently burned material, produced mainly from flushes during kiln<br />
operation.<br />
Both are to be stored in Storage & Reclaiming stockpile, to be reprocessed. Therefore, no tailing<br />
accumulation or landfilling is foreseen for tailings. The Storage & Reclaiming stockpile area has<br />
not yet been defined.<br />
14.7 Potential Waste Disposal Area<br />
The design criteria adopted for the landfill areas (location not yet defined), shall include the<br />
implementation of the materials deposit, whether from cuts, or loan, within the limits of design<br />
sections ("offset") at the project influence areas facilities.<br />
SRK Consulting (U.S.), Inc. September 16, 2011<br />
Cerrado <strong>Verde</strong>_<strong>NI</strong> <strong>43</strong>-<strong>101</strong> PEA_3<strong>43</strong>500.020_007_KG