15.05.2015 Views

NI 43-101 Preliminary Economic Assessment - Verde Potash

NI 43-101 Preliminary Economic Assessment - Verde Potash

NI 43-101 Preliminary Economic Assessment - Verde Potash

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Verde</strong> <strong>Potash</strong> Plc 12-12<br />

Cerrado <strong>Verde</strong> Project<br />

<strong>NI</strong> <strong>43</strong>-<strong>101</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong><br />

Table 12.2.5.1: Block Models Parameters<br />

Target<br />

Target 4<br />

Target 6<br />

Target 7<br />

Target 10<br />

Target 11<br />

Extension (m)<br />

Block Models<br />

Block size Sub-block minimum Number of<br />

Minimum Maximum<br />

Directions<br />

(m)<br />

size (m) primaries blocks<br />

East 387000 390000 50 5 61<br />

North 7855000 7859000 50 5 81<br />

RL 750 1100 10 1 36<br />

East 390000 392000 50 5 41<br />

North 7856000 7859000 50 5 61<br />

RL 800 1100 10 1 31<br />

East 403000 409000 50 5 121<br />

North 7865000 7874000 50 5 181<br />

RL 750 1000 10 1 25<br />

East 408500 410500 50 5 41<br />

North 7873500 7876500 50 5 61<br />

RL 800 1000 10 1 21<br />

East 409000 415000 50 5 121<br />

North 7874000 7879000 50 5 <strong>101</strong><br />

RL 750 1100 10 1 36<br />

12.2.6 Geostatistical Analysis<br />

The target chosen to geostatistic study is target 6, because it is relative regularity of the grid<br />

exploration, amount of data (802 samples), and isometric body shape. Semi Variograms were<br />

built for this target. For the construction of semi variogram were used the composite samples<br />

file.<br />

Cross-validation process was used to check the variogram, showing a low statistical error in data<br />

interpolation. The results of verification by Cross Validation are presented in Table 12.2.6.1. A<br />

diagram of linear dependency was also built between the samples file data and the interpolated<br />

K 2 O obtained by the cross-validation process. Results were satisfactory, presenting a correlation<br />

coefficient of 0.73 and accuracy of 13.5%.<br />

Table 12.2.6.1: Cross Validation Verification Results<br />

Analysis var K 2 0<br />

Transformation<br />

None<br />

Number of points 802<br />

Mean<br />

Std Dev<br />

Raw Data 8.1965 1.5967<br />

Estimate 8.2081 1.4248<br />

Standard error 0.82398 0.24225<br />

Error statistic -0.007620 1.2884<br />

12.2.7 Grade Estimation and Resources Classification<br />

To target 6 the element K 2 O was interpolated to the empty block model by the methods Kriging<br />

and IDW (Inverse Distance Weighted).<br />

SRK Consulting (U.S.), Inc. September 16, 2011<br />

Cerrado <strong>Verde</strong>_<strong>NI</strong> <strong>43</strong>-<strong>101</strong> PEA_3<strong>43</strong>500.020_007_KG

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!