NI 43-101 Preliminary Economic Assessment - Verde Potash
NI 43-101 Preliminary Economic Assessment - Verde Potash
NI 43-101 Preliminary Economic Assessment - Verde Potash
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Verde</strong> <strong>Potash</strong> Plc 9-3<br />
Cerrado <strong>Verde</strong> Project<br />
<strong>NI</strong> <strong>43</strong>-<strong>101</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong><br />
9.2.1 Quality Controls and Quality Assurance<br />
At the time of the drilling for Funchal Norte Target, <strong>Verde</strong> did not have appropriate internal<br />
QA/QC systems. Future drilling should include at least one twinned hole from the existing set<br />
that has good QA/QC in place that could be used to verify the values from the present reverse<br />
circulation drilling program.<br />
In May 2010, <strong>Verde</strong> introduced a QA/QC program. For the internal control reference, at every<br />
20 routine samples, a certified standard, a powder blank and a duplicate was inserted and sent to<br />
laboratory.<br />
Initially, duplicates were prepared from the splitting of previous sample pulp. After analysis at<br />
SGS laboratory, the pulp were returned and forwarded to analysis at the ALS Brasil Ltda<br />
laboratory, located at Vespasiano, Minas Gerais State. From there, the pulps were sent to ALS<br />
laboratory located in Lima, Peru for analysis. The pulps are analyzed by XRF and LOI. The<br />
ALS quality management system complies with the requirements of the International Standards<br />
ISO 9001:2008 and ISO/IEC 17025:2005. Quality control samples are inserted within each<br />
analytical run. Form XRF methods, the minimum number of QA/QC samples are 2 standards, 1<br />
duplicate and 1 blank, introduced every 39 samples. The blank is inserted at the beginning,<br />
standards are inserted at random intervals, and duplicates are analyzed at end of the batch. Every<br />
batch of samples are analyzed has a dual approval and review process. The individual analytical<br />
runs are monitored and approved by the analyst. The results are compared with the initial values<br />
of SGS in graphics for duplicate controls like Thompson and Howarth, QQ and Correlation plots.<br />
This procedure was adopted until sample CV-RCS-2151.<br />
From March 2011 on, starting at the sample CV-RCS-2171, the duplicate was obtained by<br />
quartering the routine sample, verifying, in that way, the whole laboratory sample preparation<br />
process.<br />
For the accuracy control, the Australian GeoStats Phosphate certified reference material and<br />
Brazilian Instituto de Pesquisas Tecnológicas reference material were used. There were<br />
submitted to SGS for conventional XRF analysis. The standards certificates are attached at the<br />
end of this report.<br />
The blank material was prepared from pulverized quartz obtained from a Brazilian laboratory<br />
Sulfal Química Ltda. At the time, the company did not have appropriate internal contamination<br />
control. Gravel blank composed by quartz will be provided to verify the contamination of the<br />
sample preparation.<br />
For the external control reference, after analysis at the SGS laboratory, pulps were selected from<br />
routine samples, spaced 20 by 20 and sent to analysis at ALS.<br />
9.2.2 Adequacy of Procedures for Targets 4, 6, 7 10 and 11<br />
The Geosol SGS laboratory, which were performed the preparation and the chemical analysis of<br />
the bulk samples, was inspected in July 12. The inspection of the sample preparation room<br />
confirmed that the procedure described above is satisfactory. The preparation rooms and<br />
equipment are kept clean, and upon the completion of each shift, these rooms are cleaned up. All<br />
laboratories and each equipment is provided with ventilation system and exhaust fans. All<br />
instruments are in serviceable condition. The laboratory operates according to international<br />
standards and the risk of error in chemical analysis can be assessed as low.<br />
SRK Consulting (U.S.), Inc. September 16, 2011<br />
Cerrado <strong>Verde</strong>_<strong>NI</strong> <strong>43</strong>-<strong>101</strong> PEA_3<strong>43</strong>500.020_007_KG