15.05.2015 Views

NI 43-101 Preliminary Economic Assessment - Verde Potash

NI 43-101 Preliminary Economic Assessment - Verde Potash

NI 43-101 Preliminary Economic Assessment - Verde Potash

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Verde</strong> <strong>Potash</strong> Plc 22-2<br />

Cerrado <strong>Verde</strong> Project<br />

<strong>NI</strong> <strong>43</strong>-<strong>101</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong><br />

block model containing lithology, grade and product distribution, the confirmation that the mine<br />

will produce the appropriate process plant feedstock can be verified and accurately estimate.<br />

22.1.4 Costs<br />

SRK recommends that the Project be advanced in one phase of work to the prefeasibility level of<br />

evaluation and design. The cost estimate for the recommended work program is shown in Table<br />

22.1.4.1.<br />

Table 22.1.4.1: Recommended Prefeasibility Work Program Cost Estimate (US$000’s)<br />

Description<br />

Cost<br />

Infill Drilling 300<br />

Metallurgical Testwork 800<br />

Engineering Studies 500<br />

Environmental Baseline 150<br />

Other 250<br />

Total 2,000<br />

SRK Consulting (U.S.), Inc. September 16, 2011<br />

Cerrado <strong>Verde</strong>_<strong>NI</strong> <strong>43</strong>-<strong>101</strong> PEA_3<strong>43</strong>500.020_007_KG

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!