NI 43-101 Preliminary Economic Assessment - Verde Potash
NI 43-101 Preliminary Economic Assessment - Verde Potash
NI 43-101 Preliminary Economic Assessment - Verde Potash
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Verde</strong> <strong>Potash</strong> Plc 22-2<br />
Cerrado <strong>Verde</strong> Project<br />
<strong>NI</strong> <strong>43</strong>-<strong>101</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong><br />
block model containing lithology, grade and product distribution, the confirmation that the mine<br />
will produce the appropriate process plant feedstock can be verified and accurately estimate.<br />
22.1.4 Costs<br />
SRK recommends that the Project be advanced in one phase of work to the prefeasibility level of<br />
evaluation and design. The cost estimate for the recommended work program is shown in Table<br />
22.1.4.1.<br />
Table 22.1.4.1: Recommended Prefeasibility Work Program Cost Estimate (US$000’s)<br />
Description<br />
Cost<br />
Infill Drilling 300<br />
Metallurgical Testwork 800<br />
Engineering Studies 500<br />
Environmental Baseline 150<br />
Other 250<br />
Total 2,000<br />
SRK Consulting (U.S.), Inc. September 16, 2011<br />