<strong>Verde</strong> <strong>Potash</strong> Plc 16-2<br />
Cerrado <strong>Verde</strong> Project<br />
<strong>NI</strong> <strong>43</strong>-<strong>101</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong><br />
competence between the two environmental bodies may cause overlap which may result in some<br />
cases in problems and delays for mining companies.<br />
The proposed project, while in this phase of exploration, at first, will not require an<br />
environmental license. Parallel, the environmental reports that will be necessary to the<br />
application of the exploitation are already been prepared (EIA).<br />
The EIA is ongoing during 2011. <strong>Verde</strong> has hired the specialized company SSMA Assesoria de<br />
Consultoria LTDA (SSMA) to do all the EIA, which should be finished by the end of 2011.<br />
SSMA is in the course of preparing the study of environmental impacts (in Brazilian legislations<br />
it is named: EIA – Estudo de Impactos Ambienta) and the plan for the restoration of degraded<br />
areas (in Brazilian legislations it is named: PRAD – Plano de Recuperação de Áreas<br />
Degradadas), which is a requirement for filing the application for the Provisional License.<br />
The company filed the Description of the Activity Form (in Brazilian legislations it is named:<br />
Formulário de Caracterização do Empreendimento – FCE) on May 25, 2011, which is the first<br />
step of the environmental licensing procedure. Based on such form, the Minas Gerais<br />
Environmental Agency (which is named: Secretaria de Estado de Meio Ambiente e<br />
Desenvolvimento Sustentável – SEMAD) issued the Basic Instructions Form (in Brazilian<br />
legislations it is named: Formulário de Orientações Básicas – FOB) on September 13, 2011,<br />
which contains instructions on the issues to be addressed by the study of environmental impacts<br />
and the manners it should be prepared.<br />
Based on records available for review, <strong>Verde</strong> operates in accordance with Brazil legislation.<br />
With the completion of this Scoping Study, <strong>Verde</strong> will formalize reliable information of the<br />
project and have elements to complete the preparation of the necessary reports for obtaining the<br />
environmental permits.<br />
The selection of SSMA, a company qualified and specialized in making those reports, with<br />
experience and commitment to the observance of legal standards and best practices for<br />
implementing this will mitigate the risk of future remediation costs.<br />
It is difficult to determine the exact amounts which will be required to complete all land<br />
reclamation activities in connection with Cerrado <strong>Verde</strong> Project.<br />
The project is in an exploration phase and the reclamation bonds and other forms of financial<br />
assurance represent only a portion of the total amount of money that will be spent on reclamation<br />
activities over the life of a potential mine. Accordingly, it may be necessary to make a complete<br />
planned expenditures and operating plans in order to fund reclamation activities.<br />
As the Project seems to have a good recoverability, it appear won`t going to have the usual<br />
potential future liability for cleanup of tailings deposited on the expected future mining license<br />
areas and reprocessing. It is not possible to quantify at this time what the potential liability may<br />
be and detailed assessments need to be made to determine future land reclamation costs.<br />
The Project does not have a final Mine Plan of Operations and the conceptual level closure plan<br />
for the property, and therefore no reclamation and closure cost estimate budget due to the<br />
project’s preliminary nature.<br />
SRK Consulting (U.S.), Inc. September 16, 2011<br />
Cerrado <strong>Verde</strong>_<strong>NI</strong> <strong>43</strong>-<strong>101</strong> PEA_3<strong>43</strong>500.020_007_KG