<strong>Verde</strong> <strong>Potash</strong> Plc 17-2<br />
Cerrado <strong>Verde</strong> Project<br />
<strong>NI</strong> <strong>43</strong>-<strong>101</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong><br />
Table 17.1.2 Summary Capital Cost by Facility in Reals and United States Dollars in<br />
thousands, Including Applicable Taxes for a 2.2Mtpa Operation<br />
Sub-area<br />
Total Price R$(000)<br />
Total Price US$(000)<br />
With Taxes<br />
With Taxes<br />
Total R$ 393,131 $218,406<br />
General area R$ 57,448 $31,915<br />
Primary crushing R$ 6,204 $3,447<br />
Secondary crushing R$ 8,910 $4,950<br />
Stockpile R$ 1,965 $1,092<br />
Limestone storage and dosing R$ 9,531 $5,295<br />
Grinding R$ 20,010 $11,117<br />
Pelletizing R$ 40,138 $22,299<br />
Furnace R$ 139,563 $77,535<br />
Quenching R$ 12,552 $6,973<br />
Pellets classification R$ 8,119 $4,511<br />
Bulk product classification,<br />
storage, loading and shipping<br />
R$ 4,295 $2,386<br />
Raw water intake R$ 9,936 $5,520<br />
Fire fighting R$ 3,990 $2,217<br />
Compressed air R$ 6,702 $3,724<br />
Electrical substations R$ 38,<strong>43</strong>3 $21,352<br />
Main substation and transmission line R$ 25,335 $14,075<br />
*Exchange Rate is R$1.80=USD1<br />
17.1.1 Payback<br />
Based on the following economic evaluation for the two production rates, the 1.1Mtpa pellet<br />
production rate, project payback occurs in Year 3 of production. For the 2.2Mtpa production rate<br />
project payback occurs in Year 2 of production.<br />
17.2 Operating Costs<br />
For the production of fertilizer pellets with an estimated 8% to 10% K 2 O content, the 1.1Mtpa<br />
pellet production rate, operating costs are estimated at US$41.80/t of pellets, inclusive of General<br />
and Administrative costs. A summary breakdown of operating costs, excluding G&A, is<br />
presented in Table 17.2.1. For the 2.2Mtpa production rate operating costs are estimated at<br />
US$36.36/t of pellets produced, inclusive of G&A costs. A detailed breakdown of operating<br />
costs, excluding G&A, is presented in Table 17.2.2. Total operating costs are stated in both<br />
US$(000) and R$(000).<br />
SRK Consulting (U.S.), Inc. September 16, 2011<br />
Cerrado <strong>Verde</strong>_<strong>NI</strong> <strong>43</strong>-<strong>101</strong> PEA_3<strong>43</strong>500.020_007_KG