<strong>Verde</strong> <strong>Potash</strong> Plc 1-1<br />

Cerrado <strong>Verde</strong> Project<br />

<strong>NI</strong> <strong>43</strong>-<strong>101</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong><br />

1<br />

Introduction (Item 2)<br />

SRK Consulting (U.S.), Inc. (“SRK”) were mandated by <strong>Verde</strong> <strong>Potash</strong> Plc (“<strong>Verde</strong>”), formerly<br />

Amazon Mining Holding Plc, to prepare a National Instrument <strong>43</strong>-<strong>101</strong> (“<strong>NI</strong> <strong>43</strong>-<strong>101</strong>”)<br />

<strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong> (“PEA”) on the Cerrado <strong>Verde</strong> Project (the “Project”) located<br />

in Minas Gerais, Brazil.<br />

1.1 Terms of Reference and Purpose of the Report<br />

This PEA is intended for the use of <strong>Verde</strong> to fulfill applicable securities obligations. This<br />

document provides a PEA of the Project, prepared according to <strong>NI</strong> <strong>43</strong>-<strong>101</strong> guidelines. Form <strong>NI</strong><br />

<strong>43</strong>-<strong>101</strong>F1 was used as the format for this report.<br />

This report is prepared using the industry accepted Canadian Institute of Mining, Metallurgy and<br />

Petroleum (CIM) “Best Practices and Reporting Guidelines” for disclosing mineral exploration<br />

information, the Canadian Securities Administrators revised regulations in <strong>NI</strong> <strong>43</strong>-<strong>101</strong> (Standards<br />

of Disclosure For Mineral Projects) and Companion Policy <strong>43</strong>-<strong>101</strong>CP, and CIM Definition<br />

Standards for Mineral Resources and Mineral Reserves (November 27, 2010).<br />

This document provides a report on the results of mining, processing and a preliminary economic<br />

assessment of the potential project development. An update was made to the overall project<br />

resources, which now include Targets 4, 6, 7, 10 and 11. Targets 4, 6, 7, 10 and 11 resources are<br />

reported in addition to the existing Funchal Norte Target resources. The preliminary economic<br />

assessment is based only on the mineral resource estimate for the Funchal Norte Target as of<br />

March 1, 2011.<br />

The PEA is based on inferred and indicated mineral resources only that are considered too<br />

speculative geologically to have the economic considerations applied to them that would enable<br />

them to be categorized as mineral reserves, and there is no certainty that the preliminary<br />

assessment will be realized. Mineral resources that are not mineral reserves do not have<br />

demonstrated economic viability.<br />

1.2 Reliance on Other Experts (Item 4)<br />

Section 15 of this report relies on AgroConsult Consultoria & Marketing (AgroConsult) for price<br />

and market analysis. AgroConsult prepared in depth analyses on the various agribusiness<br />

segments with a view to formulating short, medium and long term market trend reports on the<br />

main agricultural commodities as well as to developing customized studies and projects. In<br />

order to reach an average price per mixing center, the Thermo<strong>Potash</strong> benchmark price for each of<br />

the crops was weighted in accordance with the relevant demand potential. However, the average<br />

weighted price obtained reflects individual prices per crop. Consequently, the price would<br />

exceed the maximum price for some crops and the product would be too expensive. Therefore,<br />

the price was realigned to cater to 95% of the potential market. In this case, the resulting price is<br />

the potential price for Thermo<strong>Potash</strong> at the mixing center. Its complete results could be verified<br />

in the report prepared for <strong>Verde</strong> “Price and competitiveness survey for introducing<br />

Thermo<strong>Potash</strong> on the Brazilian fertilizer market” published in November of 2010.<br />

<strong>Verde</strong> provided geological data and information to BNA for Sections 5 through 9. The<br />

information provided was verified by BNA and accepted for the use in this report.<br />

SRK Consulting (U.S.), Inc. September 16, 2011<br />