NI 43-101 Preliminary Economic Assessment - Verde Potash
NI 43-101 Preliminary Economic Assessment - Verde Potash
NI 43-101 Preliminary Economic Assessment - Verde Potash
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Verde</strong> <strong>Potash</strong> Plc 10-2<br />
Cerrado <strong>Verde</strong> Project<br />
<strong>NI</strong> <strong>43</strong>-<strong>101</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong><br />
Table 10.1.1: Standards Utilized by Bureau Veritas<br />
Standard<br />
Expected<br />
ValueK 2 0% +/-10% (EV) Failed<br />
IPT 146 0.04 0.034 and<br />
0.042<br />
No of<br />
Analyses Minimum (%) Maximum(%) Mean (%)<br />
5 6 0 .07 0.05<br />
IPT 53 12.1 10.89 and 0 6 11.95 12.61 12.18<br />
13.31<br />
IPT53+IPT146 6.07 5.46 and 6.67 0 6 5.84 6.36 6.07<br />
Pulp Blank 0