- Page 1 and 2:
Package No Ministry of Health & Fam
- Page 3 and 4:
Package No. Regional Institute of M
- Page 5 and 6:
Regional Institute of Medical Scien
- Page 7 and 8:
Regional Institute of Medical Scien
- Page 9 and 10:
Regional Institute of Medical Scien
- Page 11 and 12:
Regional Institute of Medical Scien
- Page 13 and 14:
Regional Institute of Medical Scien
- Page 15 and 16:
Regional Institute of Medical Scien
- Page 17 and 18:
Regional Institute of Medical Scien
- Page 19 and 20:
Regional Institute of Medical Scien
- Page 21 and 22:
INDEX GENERAL CONDITIONS OF CONTRAC
- Page 23 and 24:
-----------------------------------
- Page 25 and 26:
-----------------------------------
- Page 27 and 28:
-----------------------------------
- Page 29 and 30:
1.1 Definitions GENERAL CONDITIONS
- Page 31 and 32:
otherwise agreed by the Engineer an
- Page 33 and 34:
(a) The Engineer's Representative s
- Page 35 and 36:
(b) the purchase of materials which
- Page 37 and 38:
7.1 Supplementary Drawings and Inst
- Page 39 and 40:
10.3 Costs of Securities The cost o
- Page 41 and 42:
14.2 Revised Programme HSCC/RIMS/20
- Page 43 and 44:
accuracy thereof and the Contractor
- Page 45 and 46:
(iv) pressure waves caused by aircr
- Page 47 and 48:
(b) loss or damage to any property
- Page 49 and 50:
when required, produce to the Consu
- Page 51 and 52:
shall immediately be reported by th
- Page 53 and 54:
or ancillary to the Works. 31.2 Fac
- Page 55 and 56:
state or the Central Government or
- Page 57 and 58:
investigations or enquiry under thi
- Page 59 and 60: 36.5 Engineer's Determination Where
- Page 61 and 62: (c) The removal and proper re-execu
- Page 63 and 64: COMMENCEMENT AND DELAYS 41.1 Commen
- Page 65 and 66: the Contractor has (a) (b) within 2
- Page 67 and 68: therein. The Contractor shall be en
- Page 69 and 70: Contract. If, in the opinion of the
- Page 71 and 72: provisional rates or prices to enab
- Page 73 and 74: Notwithstanding any other provision
- Page 75 and 76: 54.5 Conditions of Hire Contractor'
- Page 77 and 78: used, in whole or in part, or not a
- Page 79 and 80: such is made in a special item prov
- Page 81 and 82: the receipt of the monthly statemen
- Page 83 and 84: progressively reduced by the amount
- Page 85 and 86: 60.13 Final Certificate Within 28 d
- Page 87 and 88: materials which have been deemed to
- Page 89 and 90: with the Contract for any Permanent
- Page 91 and 92: RELEASE FROM PERFORMANCE 66.1 Payme
- Page 93 and 94: of a notice from the Arbitrator, fa
- Page 95 and 96: which payment is to be made, subjec
- Page 97 and 98: ANNEXURE - A PROFORMA OF INDENTURE
- Page 99 and 100: 8. That the Contractor hereby charg
- Page 101 and 102: INDEX INSTRUCTION TO BIDDERS ------
- Page 103 and 104: SPECIFIC CONDITIONS OF CONTRACT ---
- Page 105 and 106: -----------------------------------
- Page 107 and 108: -----------------------------------
- Page 109: (C) SPECIFIC CONDITIONS OF CONTRACT
- Page 113 and 114: 4.1 The Bidder is advised to acquai
- Page 115 and 116: C. Preparation of Bids 8.0 Language
- Page 117 and 118: ) In the case of successful Bidder,
- Page 119 and 120: 15.3 All the above three envelopes
- Page 121 and 122: 19.4 The Bidder's names, general te
- Page 123 and 124: unsolicited benefits to the Employe
- Page 125 and 126: SPECIFIC CONDITIONS OF CONTRACT The
- Page 127 and 128: e) The responsibility for making th
- Page 129 and 130: 36.1.4 Arms and Ammunition The Cont
- Page 131 and 132: 36.1.14 The wage record and wage sl
- Page 133 and 134: The increase/decrease in prices sha
- Page 135 and 136: 37.0 Taxation The Contractor shall
- Page 137 and 138: conveyance to Site as no workers/ s
- Page 139 and 140: 39.2.9 Approval of Samples prior to
- Page 141 and 142: 39.7 Metric Units The Contractor sh
- Page 143 and 144: 39.8.1.4 The laboratory shall be co
- Page 145 and 146: the contractor to avoid any interru
- Page 147 and 148: Actual measurement of secured advan
- Page 149 and 150: ADDITIONAL SPECIFIC CONDITIONS OF C
- Page 151 and 152: 4.4 No material or equipment may be
- Page 153 and 154: 8.0 Technical Data 8.1 Deleted 9.0
- Page 155 and 156: for human safety. Complete sets of
- Page 157 and 158: 22.0 Control System During the main
- Page 159 and 160: B) RELATING TO ELECTRICAL INSTALLAT
- Page 161 and 162:
sets of working electrical drawings
- Page 163 and 164:
18.0 Inspection, Testing and Inspec
- Page 165 and 166:
c. Location and rating of sockets a
- Page 167 and 168:
26.0 Completion Certificate 26.1 On
- Page 169 and 170:
(C) SPECIFIC CONDITIONS OF CONTRACT
- Page 171 and 172:
d. Schematic control drawings givin
- Page 173 and 174:
11.0 Samples and Prototypes The Con
- Page 175 and 176:
to use the plant to Air condition s
- Page 177 and 178:
24. Handing over & Taking over proc
- Page 179 and 180:
provisions of the Contract at the t
- Page 181 and 182:
the extent of loss, damage, cost, c
- Page 183 and 184:
ANNEXURE - C PROFORMA FOR BID SECUR
- Page 185 and 186:
ANNEXURE - D APPENDIX TO TENDER Imp
- Page 187 and 188:
damage, costs, charges and expenses
- Page 189 and 190:
ANNEXURE - F To PROFORMA FOR ADVANC
- Page 191:
Security which the Employer may hav