02.06.2015 Views

REGIONAL INSTITUTE OF MEDICAL SCIENCES IMPHAL ...

REGIONAL INSTITUTE OF MEDICAL SCIENCES IMPHAL ...

REGIONAL INSTITUTE OF MEDICAL SCIENCES IMPHAL ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

25.0 Cutting and Making Good<br />

25.1 No structural member shall be chased or cut without the written<br />

permission of the Engineer.<br />

26.0. Operation and Running of entire system<br />

The contractor shall pay for and arrange for operation & running of entire<br />

sanitary, plumbing and fire fighting system including pumps and RO plant,<br />

solar water heating system etc. for a minimum period of one month after<br />

satisfactory completion of work as desired by Engineer. Cost of operation<br />

& running of entire system including required material e.g fuel,<br />

consumables, tools & tackles, requisite manpower etc. shall be deemed to<br />

be included in the contract price and nothing extra shall be paid.<br />

HSCC/RIMS/2010/01 P I<br />

SCC-48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!