02.06.2015 Views

REGIONAL INSTITUTE OF MEDICAL SCIENCES IMPHAL ...

REGIONAL INSTITUTE OF MEDICAL SCIENCES IMPHAL ...

REGIONAL INSTITUTE OF MEDICAL SCIENCES IMPHAL ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

defects in materials and/or in workmanship detected in the course of<br />

testing shall be rectified by the Contractor entirely at his own cost, to the<br />

satisfaction of the Engineer. The installation shall be tested again after<br />

removal of defects and shall be commissioned only after approval by the<br />

Engineer. All tests shall be carried out in the presence of the Engineer or<br />

the Engineer's representative.<br />

31. Operation and Running of entire system<br />

The contractor shall pay for and arrange for operation & running of entire<br />

electrical system including DG sets, lifts and other equipment for a<br />

minimum period of one month after satisfactory completion of work as<br />

desired by Engineer. Cost of operation & running of entire system<br />

including required material e.g fuel, consumables, tools & tackles,<br />

requisite manpower etc. shall be deemed to be included in the contract<br />

price and nothing extra shall be paid.<br />

32. Layout of all services, Operating & Maintenance Instructions, Do’s &<br />

Don’ts etc.<br />

Layout of all services, Operating & Maintenance Instructions, Do’s &<br />

Don’ts etc. for all the plant rooms, AHU’s Machine rooms, Sub-stations,<br />

Pump Rooms, Toilets, Control Panels, etc. must be equipped with<br />

coloured layout of services for each floor. Operation & Maintenance<br />

Manual of the respective services, Do’s & Don’ts for all the plants,<br />

machinery & services to be installed with every individual units.<br />

HSCC/RIMS/2010/01 P I<br />

SCC-58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!