22.0 Control System<br />

During the maintenance period, once each month the Contractor shall<br />

check all controls in various areas to ensure that these are functioning as<br />

designed. This shall apply to all pressure switches and pressure gauges,<br />

contactors, relays, controller switches, high and low pressure cut-outs etc.<br />

23.0 Reference Points<br />

23.1 Contractor shall provide permanent bench marks, flag tops and other<br />

reference points for the proper execution of work and these shall be<br />

preserved till the end of Works.<br />

23.2 All such reference points shall be in relation to the levels and locations,<br />

given in the Architectural and plumbing drawings.<br />

24.0 License and Permits<br />

24.1 Contractor shall hold a valid plumbing, electrical, HVAC license issued by<br />

the Municipal Authority or other competent authority under whose<br />

jurisdiction the work falls.<br />

24.2 The contractor has to take all the approvals of local bodies for all the<br />

addition/deletion over the approved building plans which are to be given<br />

by HSCC. The documents/drawings to be prepared and submitted in the<br />

manner desired by them after the same is approved by HSCC. Contractor<br />

has to take approvals of entire/Part works if required before start of works.<br />

Contractor will be held responsible if any work at site is carried out without<br />

having approval of municipal or local bodies.<br />

24.3 Contractor shall keep constant liaison with the competent Municipal or<br />

other authority and obtain approvals for all drainage and water supply<br />

works carried out by him.<br />

24.4 Contractor shall obtain from the competent Municipal Authority completion<br />

certificates with respect to his work as required for occupation of the<br />

building.<br />

24.5 Before start of HVAC, Electrical, ATT, Water proofing, Fire Fighting, Fire<br />

alarm system, PA System, EPABX System, Horticulture Works etc., the<br />

contractor must take approval of agencies from Engineer.<br />

24.6 Any fees deposited in connection with the work on behalf of the Client in<br />

Statutory bodies, Corporations, Government departments, etc. shall be<br />

paid by the Contractor and the same shall be reimbursed on production of<br />

original vouchers. Necessary endorsement / application if required shall<br />

be arranged from the Employer by the Engineer.<br />

HSCC/RIMS/2010/01 P I<br />

SCC-47