20.0 Painting<br />

20.1 All equipment and ancillary items such as pipes, supports etc., will be<br />

painted in approved manner, using standard colour scheme as approved<br />

by the Engineer.<br />

21.0 Safe Custody and Storage<br />

21.1 Safe custody of all machinery and equipment supplied by the Contractor<br />

shall be his own responsibility till the final taking over by the Employer. He<br />

should, therefore, employ sufficient staff for watch and ward at his own<br />

expenses. The Employer may, however, allow the Contractor to use any<br />

part of the building for temporary storage of his equipment, if such spaces<br />

are ready and available.<br />

22.0 Terms of Payment<br />

The following norms shall be followed for terms of payment of HVAC<br />

equipments & installation:<br />

A) 80% of BOQ rate shall be paid on receipt of equipment at Site and<br />

after inspection and passing on prorata basis in accordance with<br />

clause 33 of SCC<br />

B) 10% of BOQ rate shall be paid on satisfactory erection and<br />

installation of equipment on prorata basis<br />

C) 5% after successful completion of running tests and provisional<br />

taking over. 5% after final performance -cum-seasonal test to be<br />

conducted in summer or monsoon and removal of all defects<br />

pointed out during previous tests<br />

23.0 Training of Personnel<br />

The Contractor shall arrange to train the Employer's personnel on the<br />

following aspects prior to provisional take over of the plant :<br />

a) Operation of plant<br />

b) Gas charging and pumping down of the system<br />

c) Adjustments of settings for controls and protective devices<br />

d) Preventive maintenance<br />

e) Disassembling and assembling of compressor including<br />

identification and replacement<br />