10.07.2015 Views

Finding Potential Sites for Small-Scale Hydro Power in Uganda: a ...

Finding Potential Sites for Small-Scale Hydro Power in Uganda: a ...

Finding Potential Sites for Small-Scale Hydro Power in Uganda: a ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A = ( b ⋅ h)2(4.3)Where A equals the cross-sectional area and b is the width of the stream and h is thedepth of the stream.Figure 4.12 Chart<strong>in</strong>g the cross-sectional area of a stream.Source: Fraenkel et al., 1991To estimate the flow velocity, a series of floats, e.g. convenient pieces of wood, weretimed over a measured length of stream. The results were averaged and a flow velocitywas obta<strong>in</strong>ed. The velocity must then be reduced by a correction factor, which estimatesthe mean velocity as opposed to the surface velocity. Approximate correction factors toconvert surface velocity to mean velocity are accord<strong>in</strong>g to Fraenkel et al. (1991):Concrete channel, rectangular, smooth 0.852Large slow clear stream (>10 m ) 0.75<strong>Small</strong> slow clear stream (

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!