Finding Potential Sites for Small-Scale Hydro Power in Uganda: a ...

Finding Potential Sites for Small-Scale Hydro Power in Uganda: a ...

Finding Potential Sites for Small-Scale Hydro Power in Uganda: a ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

To determ<strong>in</strong>e the electrical power potential of site 19, <strong>in</strong> vic<strong>in</strong>ity of the village Nyambare<strong>in</strong> Nyamabare parish, the follow<strong>in</strong>g steps were made:To calculate the electrical power we first need to calculate cross-sectional area, flow andhead. This is done by us<strong>in</strong>g equations 4.3, 4.4 and 4.2.o Area:2(0.3 m ⋅ 0.5 m)/2 = 0.075 mo Flow:230.075 m ⋅ (1m/s ⋅ 0.65) = 0.04875 m /sWhere 0.65 is a correction factor <strong>for</strong> a small slow clear streamo Net head:ο100 m ⋅ s<strong>in</strong> 15 = 25.9 m25.9 m – 25% = 19.4 mWhere 25 % equals the loss of power due to penstock friction.By us<strong>in</strong>g equation 3.1 we then calculated the hydraulic power.o Hydraulic power:19.4 m ⋅ (0.04875 ⋅1000)l/s ⋅ 9.81 = 9283 WAs stated <strong>in</strong> section 3.1.2, there is a power loss of 35% <strong>in</strong> the turb<strong>in</strong>e when the hydraulicpower is converted to mechanical power. There is also a loss of power when convert<strong>in</strong>gto electrical power. As <strong>in</strong> the example <strong>in</strong> section 3.1.2, we have calculated with agenerator efficiency of 80 %, which gives the site at Nyambare the potential electricalpower of 4.8kW.o Mechanical power:9283 x 0.65 = 6034 Wo Electrical power:6034 x 0.8 = 4827 W or 4.8kWThe same calculations as above have been applied on the sites 2 and 25 to estimate theirelectrical power potential. Site 2 near the village Nyamatembe <strong>in</strong> Kacherere parish has anelectrical power output of 1.9 kW and site 25 near the village Rusiza <strong>in</strong> Busengo parish,48.4 kW. In<strong>for</strong>mation about all evaluated sites is attached as Appendix 9.5.55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!