10.07.2015 Views

Manual - Building Block Video CCTV

Manual - Building Block Video CCTV

Manual - Building Block Video CCTV

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INSTALLATION INSTRUCTIONS FOR PCB-BASED RECEIVERSWARNING: THIS EQUIPMENT MUST BE EARTHED.1. When mounting BBV receivers on metalwork, it is essential to maintaincorrect earthing2. CORRECT CLEARANCE. Metal spacers M3 x 10mm long should be used to mountthe PCB on the metalwork. These should be earthed to ensure optimumperformance. Spacers of the correct length will ensure that minimum airgaps are exceeded.3. Use all of the mounting points to ensure adequate support with minimumflexing when connections are made to the unit. See diagram.4. In case of queries, technical assistance is available on +44(0)1323 842727.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!