10.07.2015 Views

2002 Replacement Parts Catalog - cedip

2002 Replacement Parts Catalog - cedip

2002 Replacement Parts Catalog - cedip

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UM BOP Operating Data and Fluid RequirementsBore Sizeand WorkingPressure7-1/16” AllWP11” Except15,000 psi11” 15,000psi13-5/8”Except15,000 psi13-5/8”15,000 psiModel BGals to OpenPipe Rams(1 set)Gals to ClosePipe Rams(1 set)Gals to CloseShear Rams(1 set)Closing Area(Sq. inches)Locking ScrewTurns(Each End)ClosingRatioOpeningRatio2.2 2.3 2.4 67.3 18 11.7:1 3.8:16.2 6.2 7.4 113.8 27 13.7:1 3.7:1- - - - - - -7.5 7.5 8.8 110.15 32 8.7:1 2.3:1- - - - - - -UM BOP Tandem Booster Operating Data and Fluid Requirements*Bore Sizeand WorkingPressure7-1/16” AllWP11” Except15,000 psi11” 15,000psi13-5/8”Except15,000 psi13-5/8”15,000 psiModel BGals to OpenShear Rams(1 set)Gals to CloseShear Rams(1 set)Closing Area(Sq. inches)Locking ScrewTurns(Each End)Closing RatioOpening Ratio- - - - - 3.8:17.4 13.1 201.8 27 24.3:1 3.7:1- - - - - -8.8 11.72 198 32 15.6:1 2.3:1- - - - - -*All volumes based on shear ram configurationTC1001 29 © <strong>2002</strong> Cooper Cameron, Cameron Division

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!