2. Getting Started<br />
Illustration 2.4: Step 3 of 7: Time and Date<br />
To change these settings later, refer to Setup, <strong>Inverter</strong> details, Set Date and Time.<br />
Step 4 of 7: Installed power<br />
For each PV input, enter<br />
• surface area<br />
• installed power<br />
Incorrect setting can have serious consequences for production efficiency.<br />
Illustration 2.5: Step 4 of 7: Installed Power<br />
To change the installed power, refer to Setup, Calibration, PV Array.<br />