11.07.2015 Views

Tome Architecture and management of a geological repository - Andra

Tome Architecture and management of a geological repository - Andra

Tome Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5 – B waste <strong>repository</strong> zoneReference packages Scenario S1a Scenario S1b Scenario S1c Scenario S2Lev. 1 Lev. 2 Lev. 3 Production sites 27 NumberVolume(m 3 )Number Volume(m 3 )Number Volume(m 3 )Number Volume(m 3 )B5.3 2500 460 2500 460 2500 460 2500 460B5.4 400 70 400 70 400 70 400 70Total for B5"Cladding waste with or withouttechnological, compacted waste"42600 7790 39900 7300 39900 7300 13600 2490B6B6.1 180 30 180 30 180 30 180 30B6.2 930 400 930 400 930 400 930 400B6.3COGEMA(Marcoule)7550 3230 7550 3230 7550 3230 7550 3230B6.4 1200 510 1200 510 1200 510 1200 510B6.5Total for B6"Cladding waste <strong>and</strong> technological wastein drums"950 410 950 410 950 410 950 41010810 4580 10810 4580 10810 4580 10810 4580B7B7.1 41 155 41 155 41 155 41 155B7.2EDF, CEA,<strong>Andra</strong>4 0.7 4 0.7 4 0.7 4 0.7B7.33000 1285 3000 1285 3000 1285 3000 1285Total for B7"Sources"3045 1440 3045 1440 3045 1440 3045 1440B8B8.1 1100 470 1100 470 1100 470 1100 470B8.2 CEA, <strong>Andra</strong> 250 305 250 305 250 305 250 305B8.3Total for B8"Radium- <strong>and</strong> americium-bearing waste"5.1.9 Throughput hypotheses1 0.4 1 0.4 1 0,4 1 0,41350 775 1350 775 1350 775 1350 775Throughput hypotheses for the packages received on a <strong>repository</strong> site have been drawn up in line withthe total quantities <strong>of</strong> inventoried packages so that the operating methods for a <strong>repository</strong> along withits drifts <strong>and</strong> access shafts can be studied.In the case <strong>of</strong> B waste, the annual reference primary package acceptance figure has been set at 5,000.It would roughly correspond with a forty-year accumulated disposal period for the counted packages.All or the majority <strong>of</strong> the other reference packages will already have been produced by the 2020dateline, with the exception <strong>of</strong> certain packages produced at a later date, particularly reference packageB1.Dossier 2005 Granite - ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL REPOSITORY113/228

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!