11.07.2015 Views

Tome Architecture and management of a geological repository - Andra

Tome Architecture and management of a geological repository - Andra

Tome Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4 - General architecture <strong>of</strong> the <strong>repository</strong> in a granite medium4.1.2.2 Building for receiving B <strong>and</strong> C waste <strong>and</strong> for preparing disposal packagesThe building for receiving the B <strong>and</strong> C waste <strong>and</strong> for preparing disposal packages has three schematicsections:- a zone for unloading the primary waste transport transfer casks,- a zone for manufacturing <strong>and</strong> storing the disposal packages,- a zone for transferring the disposal packages to the transfer shaft.Figure 4.1.2Schematic organisation <strong>of</strong> the B <strong>and</strong> C waste buildingThe transport transfer cask unloading zone is fitted with a travelling crane <strong>and</strong> shielded cells. Theprimary packages are extracted from the transfer casks <strong>and</strong> placed in buffer storage before beingretrieved <strong>and</strong> placed in disposal packages.The zone for manufacturing <strong>and</strong> storing the disposal packages consists <strong>of</strong> several manufacturing lines.Each line is made up <strong>of</strong> a succession <strong>of</strong> shielded cells. Two manufacturing lines are considered for Bwaste disposal packages <strong>and</strong> one line for the C waste disposal packages.The disposal packages are routed from the end <strong>of</strong> the line to the cask loading station. The casks arethen conveyed into the shaft building for transfer to the underground installations.All types <strong>of</strong> activities planned for this building are already implemented in similar industrial nuclearfacilities.4.1.2.3 Surface building for spent fuel reception <strong>and</strong> containerisationShould spent fuel disposal be considered (UOX <strong>and</strong> MOX), a specific additional facility will be builtto receive <strong>and</strong> condition it before transfer to the underground installations. This facility could behosted in extension linked to the previous building.Dossier 2005 Granite - ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL REPOSITORY54/228

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!