11.07.2015 Views

Tome Architecture and management of a geological repository - Andra

Tome Architecture and management of a geological repository - Andra

Tome Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2 – High-Level <strong>and</strong> Long-Lived wasteTable 2.3.3 State <strong>of</strong> B <strong>and</strong> C waste volumes produced at end <strong>of</strong> 2003, conditioned or not, <strong>and</strong> stillto be produced (scenario S1a)Volume <strong>of</strong> waste produced at yearend2003 (m 3 Volume <strong>of</strong> waste toReference)packagesbe produced (m 3 )Conditioned UnconditionedB1 0 250 220B2 27 790 7 620 650B3 13 895 4 910 8 455BB4 2 730 0 0B5 135 530 7 125B6 0 4 580 0B7 155 1 285 0B8 15 760 0Total volume <strong>of</strong> B waste (m 3 ) 44 720 19 935 16 450C0 540 140 20COther glasses 880 0 4 750Total volume <strong>of</strong> C waste (m 3 ) 1 420 140 4 770Quantitative data relating to PWR fuels are found in Table 2.3.4.Table 2.3.4Number <strong>of</strong> PWR fuel assemblies"Short" UOX AFA-2GEassembly, type CU1"Long" UOX AFA-2LEassembly, type CU1ProductionsitesEDFScenarioS1aNumber <strong>of</strong> PWR fuel assembliesScenarioS1bScenarioS1cScenarioS20 0 0 27 2000 0 0 26 800Total UOX assemblies, type CU1 0 0 0 54 000"Short" MOX AFA-2GEEDF 0 5 400 5 400 4 000assembly, type CU2Total MOX assemblies, type CU2 0 5 400 5 400 4 000Furthermore, 5,810 primary claddings are to be considered for type CU3 fuels, if appropriate.Dossier 2005 Granite - ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL REPOSITORY28/228

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!