11.07.2015 Views

Tome Architecture and management of a geological repository - Andra

Tome Architecture and management of a geological repository - Andra

Tome Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4 - General architecture <strong>of</strong> the <strong>repository</strong> in a granite medium4.2.2.7 Seals <strong>and</strong> backfilling <strong>of</strong> the surface-underground connecting structuresAt the final stage <strong>of</strong> the <strong>repository</strong> closure process, the aim <strong>of</strong> backfilling <strong>and</strong> sealing the shafts <strong>and</strong>ramps is to limit the possibilities <strong>of</strong> direct water circulation between the potentially water-bearingsuperficial formations <strong>and</strong> the underground structures developed in the shaft zone at both <strong>repository</strong>levels.Figure 4.2.12Shaft closureDossier 2005 Granite - ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL REPOSITORY76/228

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!