11.07.2015 Views

Tender 11 of 2013 - Gujarat State Disaster Management Authority

Tender 11 of 2013 - Gujarat State Disaster Management Authority

Tender 11 of 2013 - Gujarat State Disaster Management Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Tender</strong> Notice No. <strong>11</strong> <strong>of</strong> <strong>2013</strong>immersed reduction unit.8.3 The base control station shall be attached to the turntable so as to rotate with it and be accessiblein all positions <strong>of</strong> the turntable.8.4 The hydraulic distributor (center post) shall be mounted in the center <strong>of</strong> the turntable at anaccessible position and shall carry the hydraulic pressure and return lines, electrical supply lines &water line allowing continuous rotation in either direction.8.5 The fasteners retaining turntable to the rotation mechanism shall be <strong>of</strong> proper grade and shall betorqued properly.8.6 The rotation gearbox fastener shall be <strong>of</strong> proper grade and torqued with proper backlash.8.7 There shall be provision for the manual rotation <strong>of</strong> turntable in case <strong>of</strong> failure <strong>of</strong> hydraulic system.8.8 Pins securing the hydraulic cylinders to boom and turntable shall be properly installed and secured.8.9 The hydraulic hoses, tubings and connections provided in the turntable shall be free from kinks,chaffings or leaks.9. MAIN FRAME9.1 The main frame shall be welded; box section type made from high tensile steel plates and shallabsorb all the stresses generated by platform and outriggers.9.2 The front mounting bolts <strong>of</strong> the mainframe shall be spring loaded to allow the chassis frame t<strong>of</strong>lex when the outriggers are fully down to avoid any stress concentration on the chassis frame.9.3 The main frame shall incorporate hydraulic oil tank, outrigger beam housing, and it shall be boltedto the chassis frame and the slew ring support plate shall be welded to the top <strong>of</strong> the main frameand shall be precision machined.9.4 The resting support for booms shall be mounted onto the mainframe, and not to the chassis frame.10. STABILISING / JACKING SYSTEM10.1 The Jacking system shall consist <strong>of</strong> hydraulically operated four outriggers mounted in theirhousings in the main frame. Each housing shall be fitted with adjustable guides to provide smoothand accurate movement <strong>of</strong> the outrigger beam. The outrigger piston rods shall be completelyprotected by closed protection pr<strong>of</strong>ile. All jacks and horizontal beams shall be hot-dipgalvanized/shot blasted for better corrosion protection.10.2 The Jacks shall be H-type construction, each outrigger shall have two separate hydraulic cylinders,the first <strong>of</strong> which pushes the horizontal outrigger beam out and the second shall push the verticalJack down.10.3 The jack shall be provided with ground pressure sensors, and each wheels shall be provided with<strong>of</strong>f-the-ground sensors, which shall be correctly actuated before the booms are operated to ensureproper stabilization.10.4 Each Vertical jack shall be provided with self-aligning footplate to spread the load evenly andallow the operation on uneven ground.SIGNATURE & STAMP OF BIDDER40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!