11.07.2015 Views

P3838_3 Mira Fino.pmd - QS Supplies

P3838_3 Mira Fino.pmd - QS Supplies

P3838_3 Mira Fino.pmd - QS Supplies

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Install the inlet pipework.If necessary, use the installation templateto ensure the pipework is in the correctposition.Grub ScrewInletConnectorNippleSpot FacesBackplateGrubScrewO SealInletElbowGrubScrew6. Thoroughly flush the incoming hot andcold water supplies before connectingthe shower control.7. Use the 3 mm A/F hexagonal wrench toloosen the two grub screws that hold theinlet elbows in position.8. Rotate the inlet elbows so that the inletconnector nipple is pointing up for fallingsupplies, or down for rising supplies.Tighten the grub screws.Make sure the elbow is aligned so thatthe grub screws locate into the spotfaces in the inlet elbow.9. Fit the shower control body onto thebackplate and secure by in position withthe two grub screws, using the 3 mm A/Fhexagonal wrench.10. Slide the compression nut, then the olive,over the hot and cold inlet pipework. Ifnecessary, smear ‘liquid jointing’ sparinglyon the pipe end and the outside of the olive.Inlet PipeworkCompressionNutOlive11. Insert the hot and cold inlet pipework into theopening of the inlet connector nipple thenslide the olive and compression nut intoplace.12. Carefully tighten the compression nut. Usea cloth to protect the plated surfaces.InletConnectorNippleShower Control15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!