P3838_3 Mira Fino.pmd - QS Supplies
P3838_3 Mira Fino.pmd - QS Supplies
P3838_3 Mira Fino.pmd - QS Supplies
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Back Inlet <strong>Supplies</strong>1. Follow the shower control installationprocedure as for “Rising or FallingInlet <strong>Supplies</strong>”: instructions 1. to 4.inclusive.Spirit Level2. Use the cardboard installation templateto mark the positions of the holes forthe backplate and the pipe centres.3. Remove the plaster and brickwork tothe required depth to conceal the supplypipework.Note! Depth must be sufficient toprevent pipe concealing plates foulingon the plumbing elbows.Installation Template4. Install the hot and cold water supplypipework ensuring that the pipe endsemerge from the wall surface at 153mm centres, and project from thefinished wall surface by 13 mm.Use the installation template to ensurethe pipes are in the right position.153 mm32 mmConcealingPlate13 mm fromfinished wallsurfaceBackplateCircularRecessElbow10 mm minbetween elbowand finishedwall surface16