11.07.2015 Views

P3838_3 Mira Fino.pmd - QS Supplies

P3838_3 Mira Fino.pmd - QS Supplies

P3838_3 Mira Fino.pmd - QS Supplies

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Mira</strong> <strong>Fino</strong> Built-in Shower ControlSolid, Dry Lined, Stud Partition or Dry Partition Wall StructuresThe built-in shower control incorporates an integral wall mounting bracket assembly whichcan be used to install the shower into a solid, dry-lined, stud partition or dry partition wallstructure, shower cubicle or laminated panel.1. Before you decide on the final position ofyour shower control, please bear in mindthe following:- Decide on a suitable position for theshower control. The position of theshower control and the showerfittings must provide a minimum gapof 25 mm between the spill-overlevel of the shower tray/bath and thehandset. This is to preventbacksiphonage.- Determine whether the hot or coldwater services will be connected to theshower control from the top (falling) orfrom the bottom (rising).2. Familiarise yourself with the hot and coldwater inlet ports and outlet port. They canbe identified as follows:The <strong>Mira</strong> <strong>Fino</strong> is supplied with inletconnections hot left, cold right and topoutlet as standard.To change the position of the inlet refer to“Reversed Inlet Connection”:instructions 1. to 6. inclusive.3. Determine the route for the incoming hotand cold water supply pipework. The outletpipework to a flexible shower fitting is bestpositioned to emerge above and to one sideof the shower control to allow the flexiblehose to drape around the underside of theshower preventing the hose from interferingwith the knob (refer to diagram).Hose RetainingRingSpill-over Level25 mmMinimum18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!