11.07.2015 Views

CAGE PROCESSING in Animal Facilities - Felasa

CAGE PROCESSING in Animal Facilities - Felasa

CAGE PROCESSING in Animal Facilities - Felasa

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 7-6WasherItems for process<strong>in</strong>gCage base Wire lid IVC rackStorage andtransport rackCab<strong>in</strong>et cage washer(3 cycles each) 10%*Tunnel cage washer(<strong>in</strong> 15 m<strong>in</strong>) 10%*Cage and rack washer(3 cycles each) 10%*1 stack with 3 wire lids put on topof each other, test strips only at themiddle lid, 10 % of the stack*1 stack with 3 wire lids put on topof each other, test strips only at themiddle lid, 10 % of the stack*1 stack with 3 wire lids put on topof each other, test strips only at themiddle lid, 10 % of the stack*- -- -1 1* of the load<strong>in</strong>g capacityWhen test<strong>in</strong>g the wash<strong>in</strong>g of bottles at the manufacturer’s, the procedure is as follows: Bottles are usually mach<strong>in</strong>ewashed. In each mach<strong>in</strong>e two 18 bottle crates are placed parallel to each other. For this configuration,the follow<strong>in</strong>g X marked bottles are to be checked over 3 cycles.Figure 7-14 View of two bottle crates with 18 bottles eachWith other configurations, test setups must be used where at least 20% of the bottles are checked. The testbottles must then be placed <strong>in</strong> critical spots with regard to mach<strong>in</strong>e type, spray<strong>in</strong>g geometry, load<strong>in</strong>g configuration,etc.7.6.2 Test after assemblyTest<strong>in</strong>g a washer after assembly is up to the customer. When choos<strong>in</strong>g to test, the customer should implementthe same test procedure as when test<strong>in</strong>g the mach<strong>in</strong>e at the manufacturer’s (please refer to 7.6.1), only byus<strong>in</strong>g the utilities on-site. If the customer wishes a test after assembly, as recommended by the AK-KAB, it hasto be ordered separately.Cage Process<strong>in</strong>g <strong>in</strong> <strong>Animal</strong> <strong>Facilities</strong> · 4th issue · 2013 57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!