11.07.2015 Views

Operation instruction - Asennustuotteet

Operation instruction - Asennustuotteet

Operation instruction - Asennustuotteet

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ABB i-bus ® KNXCommissioningSend value on every operationOptions: yesno• yes: The respective value of the communication object is updated andsent with each actuation.ExampleWith three button actuations, the communication objects1-fold operation (after the 1st operation),2-fold operation (after the 2nd operation) and3-fold operation (after the 3rd operation) are sent successivelyimmediately after the respective operation.• no: The physical input counts the number of operations that occursuccessively within the allowed time interval. Thereafter, thecorresponding number of communication objects, e.g.: three countedoperations = CO 3-fold operation is sent.Maximum time between two operationsOptions: 0.3/0.4/0.5/0.6/0.8/1/1.2/1.5/2/3/4/5/6/7/8/9/10 sThis parameter determines the time that can elapse between two operations.After an operation, it will wait for the time entered here. If there are no furtheroperations within this period, the communication object x-fold operation issent. With a further operation, the time set here restarts.If in parameter Additional communication object for long operation the optionyes is selected, the following parameter appears:sent value(object "Telegr. operation long")Options: ONOFFTOGGLEA further function can be carried out with long operation of the buttonvia the communication object Long operation. If a long operation ofthe button is undertaken within the maximum time after one or moreshort operations, the short operations are ignored.© 2011 ABB STOTZ-KONTAKT GmbH 119

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!