11.07.2015 Views

Operation instruction - Asennustuotteet

Operation instruction - Asennustuotteet

Operation instruction - Asennustuotteet

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ABB i-bus ® KNXCommissioningLong operation after …Options: 0.3/0.4/0.5/0.6/0.8 s1/1.2/1.5 s2/3/4/5/6/7/8/9/10 sHere the time period T L , after which an actuation is considered a “long”operation, is defined.NoteThe remaining parameter descriptions can be found in the parameterDistinction between short and long operation – no,page 55.© 2011 ABB STOTZ-KONTAKT GmbH 62

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!