11.07.2015 Views

1.0 - SATA-IO

1.0 - SATA-IO

1.0 - SATA-IO

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

match tests with 2STANDBY-IMMEDIATES instead of1; added note that a testcould take longer than 400seconds6. Appendix A: changed textto reflect mandatory versusfeature dependent tests7. Appendix B: changed UTDversion to 1.3; change 2.8xto 2.81• Added Appendix C forGTR-01 true failureverification and manual testprocedure for SSP-02 bothfor software release 2.81• In transistioning fromUTD1.2 to UTD 1.3 atApril 2008 Plugfest thefollowing tests werechanges needed to be orhave been done to the MOIfor UTD1.3 - GTR-01,GTR-02, GTR-03, NCQ-02, SSP-06, IPM-03 (twoareas), IPM-04, IPM-08,IPM-11.In Release .99C of the MOIthe following tests had beenchnaged prior to IW#5 GTRtests 1-3 were changed forRead Sector, qualified bits andDMA modes, NCQ-02 hadconfirmed changes ; IPM-03and 11 and loop changes;Pass/Fail clarification andtesting for PM Partial andSlumber; IPM-04 had Pass/Failclarification; IPM-08 requiredputting a drive into STANDBYIMMEDIATE for ATAPI driveas well as HDDs.Lastly SSP-06involved testing for both9 Digital MOI for LeCroy STX Bus Analyzer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!