HISTORICAL MISSION (SOUTHERN) REACH<br />

A goal in the Master Plan process was to test the application of fluvial geomorphology principles and determine its<br />

appropriateness for the San Antonio River. This investigation began with the testing of three <strong>concept</strong>ual<br />

approaches to a segment of the Historical Mission (Southern) Reach. These alternative approaches included:<br />

26 SAN ANTONIO RIVER DESIGN GUIDELINES<br />

ALTERNATIVE A – RIVER IMPROVEMENTS WITHIN THE EXISTING RIVER CHANNEL<br />

This approach included minor <strong>river</strong> channel realignment but limited to the area within the existing<br />

flood channel right-of-way.<br />

Component Pro<br />

Con<br />

Flooding Potential None<br />

Some out-of-bank flow during 100-year<br />

storm (existing).<br />

Design could raise 100-year water surface<br />

elevation where channel has capacity.<br />

Pilot Channel None<br />

Size limited to base flow (10 cfs).<br />

Bankfull event not accommodated.<br />

River Meanders Pilot channel can be curved for aesthetic<br />

purposes.<br />

Riffles and Pools Can be created.<br />

Plant and Animal Habitat Allows vegetation and habitat<br />

improvement but minimizes trees.<br />

Sinuosity does not meet fluvial<br />

geomorphologic principals and is limited to<br />

area between flood control banks.<br />

Channel Stability None<br />

Low stability- required maintenance not<br />

reduced. Much armoring required.<br />

Aesthetics Somewhat improved. “Decorated” trapezoidal channel.<br />

Canoeing Can be accommodated.<br />

Water Quality Not improved significantly.<br />

Land Acquisition None required.<br />

Other program elements Simplest pilot channel trail crossings.<br />

Budget $100M overall budget can be<br />

accommodated.<br />

None<br />

None<br />

May require some portaging.<br />

None<br />

None<br />

None